BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Surrey, British Columbia. Contact the soliciting agency for additional information.

Parks, Recreation and Culture Fleetwood Study (the "Study") in the community of Fleetwood to undertake a study to anticipate future recreation and cultural needs in the Fleetwood Plan area. TIMELINE: Request for Proposal is underway to engage the services of a qualified consulting firm (the Consultant) for Parks, Recreation and Culture Fleetwood Study (the Study) in the community of Fleetwood to undertake a study to anticipate future recreation and cultural needs in the Fleetwood Plan area. The Study will inform decisions on what amenities are to be planned and paid for within the Fleetwood Plan. The City anticipates that the Study will: (a) be the framework for planning amenities that will be required to serve the growing population within the Fleetwood Plan area. (b) give the PRC Department a foundation of data and best practices for the provision of recreation and culture amenity requirements as the planned densities and land uses are realized in the Fleetwood Plan area. (c) include a high-level cost estimate for delivering the identified amenities in the Study, which will be used to establish a PRC Community Amenity Contribution within the Fleetwood Plan area. SCOPE OF SERVICES The Consultant will provide the Services which includes the following elements: (a) A review of the existing PRC and private facilities and amenities in Fleetwood including, but not limited to: (1) Inventory (2) Condition (3) Service Levels and Use (b) Undertake a high-level review/analysis and provide recommendations for PRC provision requirements in Fleetwood: (1) Research best practices for PRC provision for similar sized municipalities to the City of Surrey. (2) Undertake a gap analysis of Citys existing provision ratios/targets in comparison to best practices. (3) Establish a set of recommended facility and amenity provision ratios or other metric based on population, use and users demographics, growth/declining uses and activities, and/or through other relevant metrics. (c) Develop a set of recommendations for the provision of PRC amenities in the Fleetwood Plan area, which include: (1) A list of facilities/amenities to meet Fleetwoods future needs as the Plan area develops. (2) Recommended renovations and expansions of existing civic facilities. (3) Potential locations for facilities/amenities within the Fleetwood Plan area. This may include: Considerations with adjacent land uses within the Plan area. Integration of public amenities within private developments. Pre-determining additional Civic land use designations for recreation and culture growth within the Plan area. (4) High-level cost estimate for the build out of the recommendations provided in the study (including land purchase and capital building costs). If the City determines that an amendment is required to this RFP, the City Representative will issue a written addendum by posting . The only way this RFP may be added to, or amended in any way, is by a formal written addendum. No other communication, whether written or oral, from any person will affect or modify the terms of this RFP or may be relied upon by any Proponent. By delivery of a Proposal the Proponent is deemed to have received, accepted and understood the entire RFP, including any and all addenda. All inquiries related to this RFP should be directed in writing to purchasing@surrey.ca The method of Contractor Selection has not been Determined at this time.

Conceptual

Fitness / Rec Centers

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
36
Bidding Soon
1,559
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.