BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a fire / police facility in Brentwood, California. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Fire Station 94 is a new two-story wood framed building located in downtown Brentwood, CA on 1st Street between Maple and Oak. The area of the site is 13,427 total square feet. The new Fire Station 94 will consist of 7,412 square feet, with a footprint of 4,092 square feet and will consist of 3 volumes. Centered is an apparatus bay, with dayroom functions on the second floor above. Slightly setback to the left are single story support spaces with a patio above. Slightly setback to the right are the living quarters on the second floor, along with additional space below, including the public entry and exercise room. The station incorporates dorm rooms, offices, day room, dining room, kitchen & pantry, exercise room and support spaces. Trades include but is limited to; concrete, masonry, metals, wood, plastics and composites, thermal and moisture protection, openings, finishes, specialties and equipment, conveying systems, fire suppression, plumbing, HVAC, Electrical, Communications, Electric safety and security, earthwork, exterior improvements, and utilities. Estimated Date of Notice to Proceed: Anticipated September 2024 Contract Duration: 770 calendar days from issuance of NTP to Substantial Completion. Closeout & Occupancy (Final Completion): 30 calendar days from Substantial Completion to Final Completion PROJECT LABOR AGREEMENT This project is subject to the policies and requirements established in the ’s Outreach Program for the use of Minority Business Enterprises (MBEs), Women Business Enterprises (WBEs), Other Business Enterprises (OBEs), Small Business Enterprises (SBEs), Local Business Enterprises (LBEs), and Disabled Veteran Business Enterprises (DVBEs). Mandatory Subcontracting Minimum (MSM) 30% for the project. C. Overaa & Co. is available to assist with bonds, lines of credit, and insurance.

Post-Bid

Fire / Police

$13,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
92
Bidding Soon
1,936
All Active Projects
815
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

September 2, 2024

img_map_placeholder

739 1st St, Brentwood, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.