BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a water / sewer project in Conroe, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The following paragraphs describe the major components of the work to be completed under this Contract. This list shall not to be construed as all-inclusive and shall not waive the Contractors responsibility to provide all necessary components of the project, either stated or implied, in full accordance with the drawings and specifications. A. The work covered under this Contract includes all components associated with construction of the odor control system at the Conroe Central Wastewater Treatment Plant (WWTP). The Contractor shall construct and put into operation, as acceptable to Owner, all portions of the work as shown in the Contract Documents. The work includes, but is not limited to structures, equipment, piping, excavation, grading, as described herein and as shown on the Contract Drawings. B. Contractor shall furnish all labor, supervision, tools and material, as described in the specifications and as shown on the drawings to perform the required work. Provide all appurtenant equipment, connections and special items necessary to accomplish the purposes shown or specified even if such appurtenances are not specifically specified or shown on the drawings. Install all items provided in accordance with the specifications, the manufacturer's recommendations and the best practices of the trades involved. C. Contractor shall assume full responsibility for the means, methods, techniques, sequences and procedures of construction and safety precautions and programs incidental thereto, and for the functional operation of equipment and systems specified in this Contract. Provide, connect, test and supervise the installation of the equipment and systems specified. The installation and testing of any device, subsystem or system must be performed under the direct supervision of persons qualified by training and experience to capably perform the work in a satisfactory manner. Site Clearing, Grubbing, Drainage, Access and Compact fill, Odor Control, System Piping and other work.

Bid Results

Water / Sewer

$738,000.00

Public - City

New Construction, Site Work

21

20

9

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
61
Bidding Soon
2,718
All Active Projects
1,056
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.