Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Chemung Township, Illinois. Design plans call for site work for a bridge / tunnel.
This funding is for the replacement of an existing Township bridge structure over the west branch of the Piscasaw Creek in Chemung Township. The existing bridge was built in 1947 and had a sufficiency rating of 70.4/100 in 2018. Project is included McHenry County Fiscal Year 2024 - 2028. As of June 27, 2024, Phase I preliminary engineering is completed. Phase II design engineering is underway. Phase III construction is anticipated to start in 2025. A design team has not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$3,000,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
White Oaks Rd, Chemung Township, IL
Related To This Project
Chemung Township, IL
Bid Date: Nov 08 2024
Chemung Township, IL
Bid Date: Nov 08 2024
Chemung Township, IL
Bid Date: Mar 09 2022
Chemung Township, IL
Bid Date: Mar 09 2022
Chemung Township, IL
Bid Date: Mar 09 2022
Chemung Township, IL
Bid Date: Mar 09 2022
Chemung Township, IL
Bid Date: Feb 03 2021
Chemung Township, IL
Bid Date: Feb 03 2021
Chemung Township, IL
Bid Date: Mar 08 2023
Chemung Township, IL
Bid Date: Mar 08 2023
Chemung Township, IL
Bid Date: Mar 08 2023
Downers Grove, IL
--
Waukegan, IL
Bid Date: Sep 26 2024
Chicago, IL
Bid Date: Aug 27 2024
Round Lake, IL
Bid Date: Jul 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.