BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Monroe, Georgia. Completed plans call for site work for a water / sewer project.

The project shall include a method of approach, equipment planned for repair work, and costs for associated work required to restore the safety buoy system to the original configuration. WCWSA possesses replacement buoys and components of the buoy connection hardware for the connection to each individual buoy that are a part of the safety buoy system, but any additional materials and all labor, tools, equipment, and any other miscellaneous items are necessary for the repair of the buoy system at the Hard Labor Creek Regional Reservoir Dam site, located in southeast Walton County, shall be included.

Post-Bid

Water / Sewer

$50,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
188
Bidding Soon
2,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 10, 2023

Project location map

To Be Determined, Monroe, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.