BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Morgan, Colorado. Working plans call for site work for a water / sewer project.

DHS Drainage - The purpose of this plan is to provide a planning document and guide for concept level planning options for drainage improvements to the site of the Morgan County Human Services Building located at 800 East Beaver Avenue in Fort Morgan, Colorado. For some time, the site has had problems with drainage in various areas on the exterior of the building. For this study we have reviewed the site, provided a topographical survey of the lot, and reviewed the historical problems with the owner. Locations- Parking Lot - Northwest & West, Parking Lot - South, Parking Lot - East & Northeast Parking Lot questions regarding these requests for proposal, please contact karla powell, administrative services manager, morgan county government, at 970-542-3500 extension 1410, by e-mail at kpowell@co.Morgan.Co.Us Bids Open- Dial by your location +1 719 359 4580 US Meeting ID: 847 0780 6002 Passcode: 072620 Find your local number: https://us02web.zoom.us/u/kea8gTCcCs All contract work must be completed on or before October 31, 2023. The project involves modifications to the Departments of Human Services Parking lot and sidewalks. Purpose of the project is to reduce damage and/or pooling of water in specific areas. This project will need to be done in sections/areas/phases with areas of the highest order to be completed first. All work must comply with the drainage study in Exhibit A. Area 1 Main Entryway: The main entryway Is located on the northwest side and is highest area of concern. The walkway may be narrowed and regraded. This walkway is connected to the parking lot and a fall in grade may be necessary. Areas on either side of the walkway should be regraded to control runoff and keep water off the walkway. New gutters for the entire building are necessary to route water away from the building. Current soil located at the front entrance of DHS, shall be replaced with non-expansive soil. The proposal shall address the phases of this portion of the project to ensure client accessibility to the building. No curbs will be added to the front parking lot due to ADA Regulations. Area 2, 3 & 4 Northeast & Northwest Parking Lot: The northwest parking lot will be entirely repaved with concrete to ensure better grading of the flat work and reduce water collection areas. Remove asphalt in the parking lot and replace with concrete. A new sidewalk will be installed and constructed additionally. Area 5 East Parking Lot: The building slab on the eastside of the building should be replaced to drain away from the building. Existing concrete under transformer will not be disturbed. The new slab should be constructed with a grade adjustment to ensure water drains away from the building. Modifications to the curb/sidewalk to create ADA compliant entrance, including transition from the parking lot. Adjacent parking lot asphalt will be removed and replaced with concrete. All concrete to be driven on must have mesh and be a minimum of 6 inches. o Sidewalk must be a minimum of 4 inches with mesh. o All contractors must comply with all City ordinances and regulations and must obtain all City permits prior to commencement of work. o Compliance with all applicable ADA Regulations is required. o All work must be complete by October 31, 2023.

Final Planning

Water / Sewer

$210,000.00

Public - County

Site Work

9

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
863
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

July 21, 2023

img_map_placeholder

Multiple Locations, Fort Morgan, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.