BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Tyndall AFB, Florida. Completed plans call for the renovation of a transportation facility.

The contractor shall accomplish the removal/disposal of existing and installation of new flooring in the requested offices of Building 486 located on Tyndall Air Force Base, FL. In Accordance with the attached Statement of Work. Successful offerer shall complete work by 60 days After Receipt of Order (ARO). A site visit will be held on Tuesday, 30 May at 11 AM CST in Building 486. While attendance is not mandatory, it is highly recommended. Please arrive at the Tyndall Air Force Base Visitor's Center no later than 10:30 AM CST If you need assistance getting access to base. If you anticipate needing help to get on base, please contact thomas.prospere@us.af.mil and brian.broady@us.af.mil so that there is accurate accounting of personnel. Air Force Carpet Program: As of 18 January 2023, carpet installation shall be accomplished in accordance with the Air Force Carpet Program, using the carpet ordering guide and one of the seven contracts awarded for materials. The Air Force Carpet Program includes modular carpet tiles, roll goods, walk-off tiles, and adhesives. Installation will be managed by local installers We will have to sign everyone into the compound to enter B486. Phones, computers, tablets, cameras, and any blue tooth device are not allowed in the areas we will be going in to. Questions are due by 2 June 2023 by 6:00PM. Quotes are due by 16 June 2023 no later than 3:00PM CST. Contractor shall furnish all labor, materials, transportation, tools, equipment, and supervision needed to: 1. Move/lift furniture and return to exact location. 2. Remove and dispose of indicated existing carpet. 3. Remove indicated portions of existing rubber base from wall and columns. 4. Furnish and install new carpet, rubber cove base, door transitions, and LVT. 5. Contractor shall verify all dimensions during site visit. 6. Contractor shall submit physical samples of carpet, transitions, cove base, and LVT to customer prior to installation

Post-Bid

Transportation Terminals

$100,000.00

Public - Federal

Renovation

4

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
13
Bidding Soon
204
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2023

July 24, 2023

img_map_placeholder

To Be Determined, Tyndall AFB, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.