BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Bedford, Virginia. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Town of Bedford is seeking proposals from consulting engineering firms who wish to be considered to provide professional engineering/bridge design and environmental services for the replacement of Bridge No. 8000, McGhee Street over Norfolk Southern (NS) Railway. The existing bridge structure is a three-span, two (2) steel girder bridge with a timber deck and concrete abutments. The existing bridge was built in 1907 and is 93’-6” long with a single lane roadway that is 14’ 9” curb to curb. Due to the poor condition of this structure, this bridge was closed to traffic in September 2018. As of September 28, 2023, a design team has been selected.

Design

Bridges / Tunnels

$526,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

Project location map

To Be Determined, Bedford, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.