BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in El Centro, California. Completed plans call for the renovation of a municipal facility.

**As of June 30, 2023 this project has been awarded to Aros Construction for $93,846.32** SCOPE FOR REPAIRS & PAINTING: 1. Interior Walls & Ceilings of Courtrooms-Prep, patched, and paint. a. Court room walls, decorative trim, window frames, door frames, all (but not limited to) must be properly prepped. b. All cracks, joints, and seals must be lightly cleaned, patched/caulked, and sealed. 2. Refinish wood-stained railing, gates, judges' bench, witness stand, & jury box. a. Wood surface must be lightly prepped and patched to remove any uneven areas for new stain. b. Apply a clear satin finish to protect stain. The JBE reserves the right to negotiate extensions to this period. B:General Building Contractor C-33:Painting and Decorating Contractor QUESTIONS REGARDING THE RFP Proposers interested in responding to the RFP may submit questions via email to the Solicitations Mailbox on procedural matters related to the RFP or requests for clarification or modification of the RFP no later than the deadline for questions listed in the timeline of the RFP. Once submitted, questions become part of the procurement file and are subject to disclosure; Proposers are accordingly cautioned not to include any proprietary or confidential information in questions. If the Proposer is requesting a change, the request must set forth the recommended change and the Proposer's reasons for proposing the change. Questions or requests submitted after the deadline for questions will not be answered. Without disclosing the source of the question or request, a copy of the questions and the JBE's responses will be made available prior to the proposal due date and time. Question Deadline 05/31/2023 at 4:00 PM PT

Award

Municipal

$93,846.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
114
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

June 23, 2023

img_map_placeholder

939 Main St, El Centro, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.