EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Clinton Township, New Jersey. Completed plans call for the renovation of a educational facility.

Notice is hereby given that sealed bids will be received by the North Hunterdon-Voorhees Regional High School District Board of Education, Hunterdon County, New Jersey for the following project: HVAC Upgrades at North Hunterdon High School and Voorhees High School PSA Commission Number 9019NHHS / 9019VHS The scope of work includes various HVAC improvements at North Hunterdon High School (NHHS) and Voorhees High School (VHS). At NHHS, the scope includes but is not limited to the replacement of building roof top units and the installation of a new on grade air handling unit. At VHS, the scope includes but is not limited to the installation of new air conditioning for the existing gym, new roof top unit for locker room area, new exhaust fan installation of the kitchen, and new insulation for existing chiller and associated piping. Pursuant to NJSA 18A:18A-21( c)(2), Addenda shall be provided no later than seven days, Saturdays, Sundays, or holidays excepted, prior to the date for acceptance of bids, to any person who has submitted a bid or who has received a bid package, by one of the listed means in the law, and additionally by downloading the bidding documents from the secure FTP website, as set forth above. Questions will be considered only up until the inquiry deadline stated in the Instructions to Bidders. Bids will be considered in accordance with N.J.S.A. 18A:18A-1 et.seq. and N.J.S.A. 18A:7G-1 et.seq. Bids will be received from a Bidder for one price for the entire project, all trades, all inclusive. Bidders must be pre-qualified by the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) in one of the following categories, pursuant to N.J.S.A. 18A:18A-27.1, et.seq.: (C032) HVACR Bidders shall also either be prequalified for, or include documentation for prequalified subcontractors for, the following classifications: (C029) STRUCTURAL STEEL AND ORNAMENTAL IRON (C030) PLUMBING (C047) ELECTRICAL Bids must be accompanied by bid security in the form of (1) a bid bond or certified or cashier's check payable to the North Hunterdon-Voorhees Regional High School District Board of Education equal to 10% of the amount of the bid, but in no case to exceed $20,000.00 per N.J.S.A. 18A:18A-24, and (2) Certificate of Consent of Surety per N.J.S.A. 18A:18A-25. The successful bidder will be required to furnish additional bonds as specified in Document 00 21 13, "Instructions to Bidders." The North Hunterdon-Voorhees Regional High School District Board of Education reserves the right to reject all bids, to waive minor immaterial defects in any bid, or to award a lump sum contract, in accordance with applicable laws, including the requirements of the Public School Contracts Law at N.J.S.A. 18A:18A-1 et seq. No bid may be withdrawn for a period of sixty (60) days after the opening date. The Contract will be awarded to the lowest responsible and responsive bidder as defined in N.J.S.A. 18A:18A-2(t) and N.J.S.A. 18A:18A-18 (c), as applicable. State Project Number: 19-3660-050-22-1000 1. Mobilization: Starts at Notice to Proceed 2. Commence Construction: 30/ June/ 2023 3. Substantial Completion: On or before Friday, August 09,2024 4. Punch List / Closeout Completion: 30 Days after Substantial Completion

Award

Educational

$2,698,800.00

Public - County

Renovation

47

21

16

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
557
Active Projects
296
Bidding Soon
4,802
All Active Projects
2,240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

June 30, 2023

img_map_placeholder

Multiple Locations, Clinton Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades at North Hunterdon High School and Voorhees High School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.