BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Champaign, Illinois. Conceptual plans call for the renovation of a municipal facility.

Project Location: 1203 S 4th Street, Champaign, IL 61820 A Professional Service Consultant, PSC, will be selected for this project. The University shall negotiate a Professional Services Agreement, PSA, with the selected firm for the entirety of the project. The initial PSA will only engage the PSC for the Schematic Design, Design Development, and 50% Construction Documents Phases with provisions to amend the contract for the completion of the project including 95% Construction Documents, Bidding and Negotiations, Construction, and Warranty Phases following approval of the University of Illinois Board of Trustees. The selected PSC shall provide professional services for the heating piping replacement in Clark, Barton, and Lundgren Halls. Clark Hall is the main office for University Housing. It was originally a residence hall and dining facility but was converted to offices on floors 2-4. The lowest level contains services and mechanical rooms. The first floor is mainly reception and student lounge for Barton and Lundgren. Barton and Lundgren Halls are residence halls used for student housing on all floors. The overall project includes replacement of existing piping along with the addition of heat exchanger to provide cooling. Most of the heating water risers in these three (3) buildings is from the original 1940 construction. System failures have occurred on numerous occasions through severe corrosion resulting in sediment blocking water flow or broken pipes. In system failure, loss of heat occurs impacting the 280 residents of Barton and Lundgren Halls in addition to the 80 staff working in Clark Hall. As a result of the shared piping network including returns and a common header corrosion, blockage, or other failures in one building often impacts the entire system. The goal of the project is to replace the current heating and cooling systems. Currently, Clark Hall has central air conditioning from the basement to the second floor with window air conditioning units above the second floor. Barton and Lundgren Halls have no air conditioning. This project will add a/c to the two residence halls and the third and fourth floors of the office building. An extensive Feasibility Study was performed by Grumman Butkus. The final submission is dated January 31, 2023, and is included on the FTPSite for this projects reference. The site is read only. It is up and available here: https://fssecure.fs.illinois.edu/thinclient/Login.aspx username: U22085 password: kJuig27b Much of the work will be on the interior of the buildings with limited involvement of the exterior of the building. Any interior spaces in Clark Hall that are affected by the removal and replacement of piping and converters will be restored to its current historic references. There are no plans to update any other systems unless they relate specifically to the piping and heating system.

Conceptual

Municipal

$133,733.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
52
Bidding Soon
700
All Active Projects
342
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 12, 2024

img_map_placeholder

1203 S 4th St, Champaign, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.