Renovation of a water / sewer project in Golden, Colorado. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000320962 2023 Water Treatment Plant Improvements which includes reclaim basins, clean sludge out of the basins to accommodate work, and RTR Channel Improvements, and Bid alternate E1. Questions are submitted online No. For technical information contact: IMEG - Glendon W. Berrett, P.E. Project Executive 7600 E. Orchard Road, Suite 250-S Phone: (303) 872-9031 Email: glendon.w.berrett@imegcorp.com Schedule A - Reclaim Basin Improvements (Base Bid) 1. Complete dewatering of the reclaim basins and clean sludge out of the basins to accommodate work. Install other temporary operational means, dewatering pump, and temporary piping to accommodate backwashing without impacting the main reclaim basin. 2. Demolish existing sludge sweeps. 3. Install two new owner supplied sludge sweeps, and complete associated electrical, controls, and SCADA integration. 4. Install valves (eccentric plug valves and check valves), electric actuators and associated piping. Core drill pipe penetrations in basins. 5. Install two new submersible dewatering pumps, and associated piping. 6. Replace Access Hatches 7. Coating work of existing piping support below the water level in the reclaim basin. 8. Core drill and install pipe/valving between "forebay area" and main reclaim basin, along with valve operator extensions/guides. 9. Cleanup and return to standard service. Schedule B - RTR Channel Improvements 1. Minimal demolition, temporary removal of stainless-steel baffle wall to accommodate the construction of a new concrete divider wall, and v-notch weir to accommodate single point of chlorine dosing and operational flexibility. 2. Construct cast in place concrete wall, including reinforcement etc. 3. Install slide gates and grated walkway for access to the gates. 4. Coating work of large diameter raw water and overflow cast iron pipes in RTR basin basement. 5. Clean up and return to service. Schedule C - Bid Alternate E1 1. Replacement of existing receptacles with new GFCI Receptacles in basement area of the Raw Water Pump Station

Award

Water / Sewer

$555,447.00

Public - City

Renovation

20

14

5

6

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Coordination with Occupants, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Reference Standards, Execution and Closeout Requirements, Execution, Application, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
60
Bidding Soon
911
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

August 28, 2023

img_map_placeholder

1409 10th St, Golden, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Water Treatment Plant Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.