BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Westfield, Massachusetts. Completed plans call for the renovation of a water / sewer project.

Water Recovery Facility Dewatering Upgrades. The Work includes the following major items: The project involves demolition of a belt filter press, belt conveyor, sludge pumps, concrete curbs and pads and associated mechanical and electrical items. The work consists of installation of a centrifuge, two screw conveyors, three rotary lobe sludge pumps, piping, access platform, monorail and hoist, overhead door, HVAC ductwork and air conditioning system, and electrical work. CONSTRUCTION CONSTRAINTS Solids Handling Improvements Construction Constraints a. Solids Handling Improvements include but are not limited to: 1) Installation of new centrifuge, process piping work, odor control ductwork modifications, new shaftless screw conveyors, and sludge feed pump replacement. All demolition and new work including structural, mechanical, electrical, controls, etc. required for installation of the new equipment. b. Perform demolition and modifications such that either the existing Belt Filter Press No. 1 or the proposed centrifuge are online and available for use by the Owner at all times to dewater sludge. c. The maximum shutdown duration for replacement of Belt Filter Press No. 2 with the new centrifuge shall be 60 calendar days. Belt Filter Press No. 1 shall remain fully operational during this period. d. The Contractor shall be permitted a maximum shutdown of 4 calendar days to replace the existing belt conveyor with Main Screw Conveyor No. 2. The Contractor shall provide the Owner with a minimum 14 calendar days of advance notice prior to performing this work. e. The Contractor shall schedule the sludge feed pump replacement work such that two of three sludge feed pumps are fully operational at all times. The maximum duration that a sludge feed pump may be out of service for replacement shall be 28 calendar days. Addendum #2 has been posted with clarifications and filed sub bid results. The HVAC filed sub bid has been rejected and is open to all HVAC subcontractors. Contractor Qualification: DCAMM Certificate Note from Associated Construction: site photos have been issued. Addendum #1-#3 have been issued as of 6-26-2023.

Award

Water / Sewer

$3,127,677.00

Public - City

Renovation

74

45

7

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
158
Bidding Soon
2,904
All Active Projects
1,230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 28, 2023

img_map_placeholder

To Be Determined, Westfield, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.