EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 23, 2023 at 8:00 PM

Updated October 1, 2024

Demolition and site work for a detention facility in Center City, Minnesota. Completed plans call for the demolition of a detention facility; and for site work for a detention facility.

Demo of Jail Buildings, removal of hazardous materials, clearing of existing trees, mass grading, fencing, and final site restoration for Chisago County Jail Demolition. Deadline for Submitting a Question June 7, 2023 4:30 P.M. . Questions can be submittedbye-mailtobrett.morse@tkda.comandcopyto chase.burnham@chisagocountymn.gov Project Location: 109 & 111 North Main Street, Center City, Minnesota 55012. a. Demolition and removal of materials, all inclusive, of the original Jail facility located at 109 North Main Street. This facility is the original Chisago County jail and can be described as a 2-story residential type structure with a full basement. b. Demolition and removal of materials, all inclusive, of the Jail facility located at 111 North Main Street. This facility is a one-story facility with a walk out basement and is a masonry/concrete structure built on spread foundations. c. Abatement of hazardous and regulated materials as outlined in attached reports and specifications prepared by American Engineering Testing (AET). d. Disconnection and removal of utilities including fiber-optic. e. Removal of communications tower and back-up diesel generator. f. Removal of site materials including asphalt parking lot material, clear and grub vegetation and trees, sidewalk and curb cuts (Alternate No. 1), wood storage building, exterior stairs and chain link fencing. g. Removal, transportation and disposal of materials in a lawful manner. h. Relocation of brick historical monument. i. Backfill and compact soil to elevations shown. Provide final grading and seed. j. Construction of new chain link fencing. k. Construct new curb where curb cuts were removed and construct new concrete sidewalk (Alternate No. 1). l. And other Work indicated in the Contract Documents

Bid Results

Jails / Prisons

$292,800.00

Public - County

Demolition, Site Work

57

13

2

10

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
68
Bidding Soon
837
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

img_map_placeholder

109 N Main St, Center City, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.