BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Tontitown, Arkansas. Completed plans call for site work for a water / sewer project.

The Project consists of but is not limited to approximately 1,640 linear feet of 8" PVC sewer line, 500 linear feet of 12" PVC sewer line, and 1,110 linear feet of 8" DI sewer line, manholes, and associated appurtenances. All questions and inquiries regarding the project should be directed to the Engineer: Engineer: Garver, Ryan Pottinger, P.E. Title: Project Engineer Email: RAPottinger@garverUSA.com Phone: 479-287-4670

Bid Results

Water / Sewer

$999,100.00

Public - City

Site Work

23

22

7

11

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
56
Bidding Soon
684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

September 11, 2023

Project location map

S Pianalto Rd, Tontitown, AR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.