BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Pleasant Hill, California. Completed plans call civil work for a post-secondary education facility.

As of December 18, 2023, the project has been completed. Demolition took 2 days to be completed, however, an exact timeline has not been cofnirmed. All questions related to this project must be submitted, via email, to: Ben M. Cayabyab, Contracts Manager Contra Costa Community College District 500 Court St., Martinez, CA 94553 Email: bcayabyab@4cd.edu SCOPE OF WORK: A. Under this Application, demolition activity will occur at the Art Gallery Building and the associated pedestrian bridge of DVC Pleasant Hill, CA Campus, using the sequences listed in the drawings. The Art Gallery Building will be fully demolished to subgrade. The existing foundations shall be left in place and below grade portions of the structure shall be backfilled to match the existing grade. Add minimum 2% slope at final Backfill. The final condition includes the construction of a new guardrail and restoration of the grade conditions after the demolition of the Art Gallery Building. See Drawings and Specs. WORK CONTRACT, CHANGES (a) By their signatures below, effective on the above date, these parties promise and agree as set forth in this Agreement, incorporating by these references labor and materials contained in Section 2, Scope of Work. (b) Contractor shall, at Contractor's own cost and expense, and in a workmanlike manner, fully and faithfully perform and complete the work; and will furnish all materials, labor, services, equipment, and transportation necessary, convenient and proper in order fairly to perform the requirements of this contract, all strictly in accordance with the Scope of Work in Section 2 above, and the Public Agency's plans, drawings and specifications, and with Supplementary General Conditions, if any. (c) The work can be changed only with Public Agency's prior written order specifying such change and its cost agreed to by the parties; and the Public Agency shall never have to pay more than specified in Section 7 without such an orde

Occupancy

Educational

$90,250.00

Public - County

Demolition, Site Work

19

12

6

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
85
Bidding Soon
1,944
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

July 22, 2023

img_map_placeholder

321 Golf Club Rd, Pleasant Hill, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.