BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Gladwin, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; water / sewer project; road / highway; and road / highway.

As of March 19, 2024, construction is underway. 0.50 mi of bridge reconstruction including widening, superstructure replacement with 48-inch by 49-inch prestressed concrete bulb-tee beams, guardrail, steel piling, steel sheet piling, cofferdams, drainage and approach work on M-30 over Tobacco River, Gladwin County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year pavement performance warranty and a 2 year concrete surface coating warranty. This is an OJT VIP Pilot Project. Please see Special Provision for Preparation and Consideration of Bids on On-the-Job-Training Voluntary Incentive Program Projects. Net classification required for this project is 12019 Fa Control Sec Job No Federal No ER 26031 212508A 23A0611 MI DOT - 2308 201 - Bridge Reconstruction Including Widening, Superstructure Replacement Prestressed Concrete Bulb-tee Beams, Guardrail, Steel Sheet Piling, Drainage and Approach Work on M-30

Under Construction

Bridges / Tunnels

$12,452,920.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

163

8

30

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
23
Bidding Soon
370
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2023

October 4, 2023

img_map_placeholder

M-30, Gladwin, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.