Published September 22, 2023 at 8:00 PM

Updated March 27, 2024

Site work for a water / sewer project in Elberton, Georgia. Working plans call for site work for a water / sewer project.

Amendment 0002 The purpose of this amendment is to cancel the Invitation for Bid Pursuant to the authority in DFARS 214.404-1 (1), the Government has determined it is appropriate to cancel the subject IFB, and in the Governments best interest to re-package, and re-solicit the subject project at such time which an award can be made within the authorization provided. This project of work involves a design to repair designated areas that are eroded along approximately 1,850 linear feet of bank revetment and 2 stone flow diversion structures extending an additional 400 linear feet on the Georgia side of the Savannah River near the tail race of the Richard B. Russell Dam. The stone revetment will be constructed to tie into the existing up-river and down-river portions of the revetment. Repairs will include the placement of stone over the original footprint of the revetment and diversion structures and grouting of the void underneath the stairs of the diversion structure furthest downstream of the dam. The repaired revetment and diversion structures will consist of armor stone. The diversion structures and bank line revetment will be built to existing sidewalk crest elevations with 2:1 side slopes, in accordance with the original design. The current estimated quantity of rock is 6125 TN. It is anticipated that work will be completed from the water on a barge. Boat ramps are available for use. Upon completion of use of the staging area, all pavement that has been disturbed during the staging process shall be resurfaced. The contractor will verify accessibility for selected equipment. Vessel traffic in the vicinity of the is expected to be minimal and limited to occasional recreational boaters. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a well-graded mass of rock and to minimize impacts to fish and wildlife. Additional project requirements include erosion control provisions, earthwork incidental to rock placement, and avoidance of disturbing existing utilities. See Solicitation Documents for further details. Information found on https://www.usace.army.mil/Business-With-Us/Partnering/ is provided to comply with FAR 36.211 (b). Visti https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912HN23B5005 to obtain more details. The Construction of this contract is between $500,000.00 and $2,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$2,658,756.00

Public - Federal

Site Work

28

12

3

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
128
Bidding Soon
1,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

November 10, 2023

Project location map

To Be Determined, Elberton, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.