BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Lakeland, Florida. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Scope of Work: Construct all new required metal stud framing in accordance with all plan sheet illustrations. o Anchor new metal stud framing to floor and structure above existing ACT. o All new drywall is to receive a level 5 smooth finish or match existing. o Remove and relocate the shelf from north sidewall to south side new constructed wall. o All oak material is to be of the same oak species and top-quality material. Contractor shall determine appropriate sizing for all oak material requirements. Longest length material is required. No piece work will be permitted. o The new door, hardware and frame shall match the existing doors, frames, and hardware. o The 2 new doors width shall be 36" in width with a narrow side-lite insert is to be provided and installed in the new door by contractor. o The new double doors shall be 72" in width is to be provided and installed by contractor. o New millwork step stage unit shall be constructed and cover with approved carpet tile. o New steel window shall be factory painted by KAWNEER in-frame interior framing systems. All glazing shall be tempered. o Reuse and match existing oak finishes for all new and existing work. o Provide and install continuous oak trim in all new framed openings. o Miter all exposed oak trim edges (typical). o ACT ceiling will be rearranged and replaced if needed on the new entrance zone at south area. o Relocate the lighting fixtures. o Supply and install new LED 2'X4' flat panel as required plan sheet illustrations. o Supply and install down spotlight as shown on plan sheet illustrations. o All new lights will relate to new light dimmer switch and sensor. o Supply and install approved new wall base for the new area created. o Supply and install new partition wall with 2 windows as plan sheet illustrations at north access area. o Remove and salvage the 2-access small fence and gates. Questions regarding this construction quotation should be in writing and should reference the above quotation number. Submit all questions to Tabatha Shirah, Procurement Analyst, via e-mail to tabathashirah@polk-county.net, or via fax at (863) 534-6757. The question deadline is Tuesday, June 13, 2023 prior to 4:00 p.m. Liquidated Damages: $100.00 per day Time to Complete Project: 30 Calendar days (NTE)

Bid Results

Municipal

$49,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
163
Bidding Soon
2,790
All Active Projects
1,090
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 21, 2023

July 24, 2023

August 23, 2023

img_map_placeholder

930 E Parker St, Lakeland, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.