BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Browns Valley, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and educational facility.

General work description: Work will primarily include installation of curb, gutter, sidewalk, ADA ramps, bike lanes, striping, and traffic control devices in the community of West Linda, California, encompassing the grid of streets comprised of: Arboga Road, Alicia Avenue, Cottonwood Ave, Feather River Boulevard, Grand Avenue, Jay Avenue, and Vine Avenue. The project will extend no further than Feather River Boulevard to the West, Highway 70 to the Northeast, Island Avenue to the South, and Pasado Road to the Southeast. Associated road rehabilitation, including grading for drainage, improvements associated with drainage, storm drain, as well as new striping, will also be accounted for in the proposal. The professional preliminary engineering and construction support services requested will pertain to a comprehensive road improvement project, under the auspices of the California Active Transportation Program (ATP). his project will be funded by state and local funds, a majority of which will be from the state's ATP grant. This project will provide safer communities by enabling pedestrians to commute on sidewalks and bike lanes where they currently don't exist, and by reducing greenhouse gas (GHG) emissions. Construction is expected for 2026/2027 and is anticipated to be 2 years long. Design of plans, specifications, and estimate should plan for the project to be phased appropriately. Proposals for West Linda Comprehensive Safe Routes to School Project - Preliminary Engineering and Construction Support shall be submitted electronically via OpenGov to Yuba County prior to 4:00 P.M. on June 16, 2023. The County of Yuba is an equal opportunity employer (EOE) and Disadvantaged Business Enterprises (DBEs) are encouraged to participate. For additional proposal submittal or technical information, please contact Brett Poliquin at bpoliquin@co.yuba.ca.us. Question Submission Deadline:June 13, 2023, 4:00pm Question Response Deadline:June 16, 2023, 4:00pm The County reserves the right to reject all proposals and issue another RFP, if necessary.

Conceptual

Educational

$400,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
34
Bidding Soon
682
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2026

img_map_placeholder

Multiple Locations, Browns Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.