EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2024 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and asbestos abatement for a mixed-use development in Lewiston, Maine. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; for paving for a municipal facility; for asbestos abatement for a municipal facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

All final questions by prospective bidders pertaining to the Contract Documents, Plans and Specifications must be received, in writing, by the Purchasing Agent, by Tuesday, June 13, 2023 before the date set for the opening of the Proposals and addressed to: "Purchasing Agent, City Hall, Lewiston, Maine". If the Proposal is forwarded by mail, the sealed envelope containing the Proposal and marked as above must be enclosed in a second envelope which shall be addressed to: "Purchasing Agent, 27 Pine Street, City Hall Lewiston, Maine 04243-0479." All mailed Proposals should be sent by registered mail to ensure delivery. No faxed or electronic bids will be accepted. Any bidder may withdraw his/her Proposal prior to the scheduled time for the opening of Proposals upon presentation to the Purchasing Agent of a request, in writing, to do so. Any bidder who withdraws his/her Proposal within thirty (30) days after the actual opening thereof shall be considered to have abandoned his/her Proposal and the bid security accompanying the Proposal will be forfeited to the City of Lewiston. Any Proposal received after the scheduled opening time will not be considered. The City reserves the right to negotiate with the low bidder to bring projects down to within budget. The Finance Committee reserves the right to waive any formality and may consider as informal any Proposal not prepared and submitted in accordance with these provisions. The Finance Committee reserves the right to accept any Proposal or reject any or all Proposals if it is deemed to be in the public interest to do so. The Contract must be signed within ten (10) days, Saturdays, Sundays, and holidays excluded, after the date of notification to the bidder by the Purchasing Agent of the acceptance of his/her Proposal and readiness of the Contract to be signed. If the bidder fails or neglects, after such notification, to execute the Contract, the Finance Committee may determine that the Proposal has been abandoned; and, in such case, the bid security accompanying the Proposal shall be forfeited to the City of Lewiston. The work must be commenced within ten (10) days after the date of the Contract signing unless otherwise specified in the Specifications or directed by the Purchasing Agent, in writing, and is to be continued with diligent regularity until its completion within the time limit specified. All Proposals must be made on the blank Proposal Form bound in the Contract Documents, or as otherwise provided for in the Specifications. These prices are to cover all expenses incidental to the completion of the work in full conformity with the Contract Documents WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Unit-Price No. 1: Mobilization and Site Preparation. Mobilization; general site controls, such as fencing (site security), erection and maintenance of erosion and sedimentation control devices, project sign, temporary facilities and utilities (see Section 015000), environmental and engineering controls to contain potentially hazardous dust; and any ancillary controls/items not included in the Tasks below which are necessary for completion of the work; demobilization and Site cleanup. 2. Unit-Price No. 2: PCB Concrete Remediation. CONTRACTOR shall remove PCBimpacted concrete from specified areas of the poured concrete floor in the Upper Bates Hydro Station and the Transformer Room, via an approved method by the ENGINEER. Concrete shall be removed to below 1 mg/kg total PCBs. Post-remediation confirmation sampling is NOT included in the scope of work for the CONTRACTOR. However, CONTRACTOR shall allow for 96-hour turn-around for sampling results. CONTRACTOR will be responsible for characterizing waste streams and assuring proper handling, transport and disposal. 3. Unit-Price No. 3: Replacement of Concrete. Cost shall include the labor, equipment, tools, and other materials required for the replacement of the concrete removed from the Site. Concrete shall be restored to original height and width of the areas remediated. 4. Unit-Price No. 4: Asbestos Abatement: Asbestos-containing materials identified in the "Hazardous Building Materials Data Gap Investigation" prepared by Ransom Consulting LLC, dated June 21, 2021 (Appendix I), shall be removed in accordance with Maine Department of Environmental Protection (Maine DEP) requirements. The CONTRACTOR shall notify the Maine DEP of the intent to remove asbestos-containing materials from the site buildings on behalf of the OWNER and obtain all necessary permits.

Award

Municipal

$373,100.00

Public - City

Asbestos Abatement, Demolition, Paving, Site Work

3

15

4

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Windows, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Resilient Flooring, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
32
Bidding Soon
434
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 8, 2024

img_map_placeholder

15 Canal St, Lewiston, ME

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Brownfields Cleanup of Bates Mill #5

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.