Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Saint Louis, Missouri. Contact the soliciting agency for additional information.
The existing Airfield Maintenance Facility is the end of its useful service life and functional use, is in conflict with proposed projects to remediate nonstandard Taxiway T and build a new West Deicing Pad, and experiences occasional flooding resulting in damage to buildings and equipment. The current facility does not contain adequate structures to cover all snow removal equipment and maintenance vehicles from the elements resulting in deterioration of equipment and a safety issue for Airport employees during harsh weather conditions. The Airport Layout Plan (ALP) identified 19-acres immediately northwest of the existing campus for relocation. The selected site offers space needed to house modern airport equipment, is outside the planned relocation area for Taxiway T and West Deicing Pad, and is at a higher elevation eliminating existing flooding issues. The new AFM/SRE campus must include buildings to store all Airport Certification Manual (ACM) required snow removal equipment and the Auto Shop must be sized to work on multiple pieces of ACM required equipment simultaneously, indoors. The ALP recommended size requirements for a new AFM/SRE is 19 acres, with a total building space of approximately 258,000 sq. ft., estimated at $85M in total costs (construction, professional services, environmental evaluations, contingencies, escalation). The selected consultant will use this information along with other resources to plan and design a new AFM/SRE to meet the current and future needs to the Airport. Per the Consultant Selection Process listed below, the best qualified firms will be invited to make a presentation. The Airport intends to negotiate a price with the selected consultant to provide design services for the new Airfield Maintenance and Snow Removal Equipment Facility. Existing Airfield Maintenance Campus Facilities The AFM/SRE campus is located at the corner of St Andrews Lane and Navaid Road, situated west of Runway 6-24 and between runway ends 12R and 29. The current AFM/SRE campus is approximately 16 acres with a total building space of approximately 134,000 sq. ft. and consisting of (10) buildings.
Conceptual
Transportation Terminals
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2024
To Be Determined, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Jul 06 2023
Saint Louis, MO
Bid Date: Sep 01 2021
Saint Louis, MO
Bid Date: Jun 30 2023
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 30 2023
Saint Louis, MO
Bid Date: Jul 20 2023
Saint Louis, MO
Bid Date: Jul 17 2023
Saint Louis, MO
Bid Date: Jul 11 2023
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jul 14 2023
Saint Louis, MO
--
Saint Louis, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.