BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Des Moines, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project provides for the installation of irrigation and new, modified soil for medians along Fleur Drive from Army Post Road to Watrous Avenue, and from George Flagg Parkway north to M.L. King Parkway. The project also provides for modifications to the medians to address sight distance issues for turning vehicles along the corridor. The site distance issues and irrigation improvements along Fleur Drive from Park Avenue to Watrous Avenue are being addressed by the Road Construction project under a separate CIP sheet, Roadway Reconstruction - Fleur Drive. Medians 1-12 located between Watrous Avenue and Gray’s Lake will be completed as part of the next Phase of Fleur Drive Reconstruction in 2021 and 2 022. Median 13, located between Watrous Avenue and McKinley Avenue will be completed as part of the 3rd Phase of the Fleur Drive Reconstruction in 2023. The remaining Medians 14-17 located south of McKinley will also be included in the 3rd Phase of the Fleur Drive Reconstruction. The median planting, soil and plant material are the result of significant donor and grant funding which support these efforts. Medians 1-3 plantings have been completed and donor funds continue to be sought in support of the remaining median plantings. This project is included in the city's fy 2023-2027 Capital Improvement Program. As of June 14, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of September 4, 2023, no new information available

Conceptual

Roads / Highways

$1,114,434.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
100
Bidding Soon
1,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

Project location map

To Be Determined, Des Moines, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.