BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Des Moines, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project provides for the installation of irrigation and new, modified soil for medians along Fleur Drive from Army Post Road to Watrous Avenue, and from George Flagg Parkway north to M.L. King Parkway. The project also provides for modifications to the medians to address sight distance issues for turning vehicles along the corridor. The site distance issues and irrigation improvements along Fleur Drive from Park Avenue to Watrous Avenue are being addressed by the Road Construction project under a separate CIP sheet, Roadway Reconstruction - Fleur Drive. Medians 1-12 located between Watrous Avenue and Gray’s Lake will be completed as part of the next Phase of Fleur Drive Reconstruction in 2021 and 2 022. Median 13, located between Watrous Avenue and McKinley Avenue will be completed as part of the 3rd Phase of the Fleur Drive Reconstruction in 2023. The remaining Medians 14-17 located south of McKinley will also be included in the 3rd Phase of the Fleur Drive Reconstruction. The median planting, soil and plant material are the result of significant donor and grant funding which support these efforts. Medians 1-3 plantings have been completed and donor funds continue to be sought in support of the remaining median plantings. This project is included in the city's fy 2023-2027 Capital Improvement Program. As of June 14, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of September 4, 2023, no new information available

Conceptual

Roads / Highways

$1,114,434.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
31
Bidding Soon
550
All Active Projects
216
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

img_map_placeholder

To Be Determined, Des Moines, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.