Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Renovation of a municipal facility in Fremont, California. Conceptual plans call for the renovation of a municipal facility.
The City has 11 building locations that have aging heating, ventilation and air conditioning (HVAC) systems that rely on R22 (freon). New R22 systems have been banned by the US EPA since 2010 and maintenance of existing systems is becoming challenging and costly. This proposal would replace the City`s R22 HVAC systems in phases over a 3-year period, based on age of systems. Phase 1 ($3M) - Police Center and FRC; Phase 2 ($2M) - City Hall and Maintenance Center; and Phase 3 ($2M) - Fire Stations 1, 4, 5, 7, Centerville Community Center, Warm Springs Community Center, and Centerville Library. It is noted that cost estimates are based on replacing R22 (freon) systems, with modern equipment that continues to use natural gas as an energy source. Consideration could be given to converting to electric This project is included in the City of Fremont's FY 2025-2028 Capital Improvement Program (CIP). As of February 4, 2025, information regarding a design team or a general contractor is not available. Funding is anticipated in 2025/2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$8,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
Multiple Locations, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: Mar 04 2025
Fremont, CA
Bid Date: Mar 11 2025
Fremont, CA
Bid Date: Mar 11 2025
Fremont, CA
Bid Date: Feb 18 2025
Fremont, CA
Bid Date: Sep 26 2025
Fremont, CA
Bid Date: Mar 11 2025
Fremont, CA
Bid Date: Jul 09 2025
Fremont, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
