Site work, paving and new construction of a mixed-use development in Clinton, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a transportation facility; and transportation facility.
The project includes: construction of a new Terminal Building, associated utility connections and parking lot, full depth asphalt pavement repair and overlay of the airport entrance road, removal of existing perimeter fence and automatic vehicle gate, and installation new perimeter fence and automatic vehicle gate. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 ALTERATION OF WORK AND QUANTITIES. The Owner reserves and shall have the right to make such alterations in the work as may be necessary or desirable to complete the work originally intended in an acceptable manner. Unless otherwise specified herein, the Engineer shall be and is hereby authorized to make such alterations in the work as may increase or decrease the originally awarded contract quantities, provided that the aggregate of such alterations does not change the total contract cost or the total cost of any major contract item by more than 25 percent (total cost being based on the unit prices and estimated quantities in the awarded contract). Alterations that do not exceed the 25 percent limitation shall not invalidate the contract nor release the surety, and the Contractor agrees to accept payment for such alterations as if the altered work had been a part of the original contract. These alterations that are for work within the general scope of the contract shall be covered by "Change Orders" issued by the Engineer. Change orders for altered work shall include extensions of contract time where, in the Engineer's opinion, such extensions are commensurate with the amount and difficulty of added work. Should the aggregate amount of altered work exceed the 25 percent limitation hereinbefore specified, such excess altered work shall be covered by supplemental agreement. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion.
Post-Bid
Transportation Terminals
$1,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2023
August 28, 2023
396 E Hwy 7, Clinton, MO
Related To This Project
Clinton, MO
Bid Date: Jul 20 2023
Clinton, MO
Bid Date: Aug 31 2023
Clinton, MO
Bid Date: Sep 06 2023
Clinton, MO
Bid Date: Aug 24 2023
Clinton, MO
Bid Date: Feb 18 2022
Clinton, MO
Bid Date: Mar 17 2022
Clinton, MO
Bid Date: Mar 08 2022
Clinton, MO
Bid Date: Sep 28 2020
Clinton, MO
Bid Date: Jun 01 2023
Clinton, MO
Bid Date: May 10 2023
Clinton, MO
Bid Date: Apr 27 2023
Clinton, MO
Bid Date: Mar 23 2023
Clinton, MO
Bid Date: May 07 2019
Clinton, MO
Bid Date: Jul 28 2021
Clinton, MO
Bid Date: Jun 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.