BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Clinton Township, Michigan. Completed plans call for the renovation of a warehouse / distribution facility.

QUESTIONS Due: Wednesday, June 14, 2023, at 12:00 p.m. (local time) Submit to: Email: Mary.Schultz@macombgov.org The project consists of work at: A. The Project consists of all necessary prep to perform the indicated work for the following 1. Macomb County Warehouse Facility, 44900 Vic Wertz, Clinton Township, MI 48036 Project consists of miscellaneous tuckpointing, CMU replacement, removal of existing paint and installation of silicone elastomeric coating, sealant removal and replacement, sandblasting and repainting of steel surfaces and installation of new expansion joints, installation of new concrete stairs and associated walks, new metal panels, replacement of ribbon windows and replacement of aluminum framed entrance and associated items. 2. Comtec, 117 S. Groesbeck Hwy., Mt. Clemens, MI 48043: Project consists of removal and replacement of fixed aluminum window. Reference Number 0000321667 Project consists of miscellaneous tuckpointing, CMU replacement, removal of existing paint and installation of silicone elastomeric coating, sealant removal and replacement, sandblasting and repainting of steel surfaces and installation of new expansion joints, installation of new concrete stairs and associated walks, new metal panels, replacement of ribbon windows and replacement of aluminum framed entrance and associated items. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required - Prevailing Wage Required

Award

Warehouse / Distribution

$960,000.00

Public - County

Renovation

14

20

20

7

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
88
Bidding Soon
1,307
All Active Projects
548
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

img_map_placeholder

Multiple Locations, Clinton Township, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.