Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 18, 2024 at 7:00 PM
Updated January 27, 2024
Site work for a water / sewer project in West Alton, Missouri. Completed plans call for site work for a water / sewer project.
PROJECT TITLE: Wood River Sewer Separation Project TYPE OF SOLICITATION: Invitation for Bid (IFB) TYPE OF CONTRACT: Firm-Fixed-Price Construction DISCLOSURE OF THE ESTIMATED MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: between $10,000,000 and $25,000,000 NAICS CODE: 237110 (Water and Sewer Line and Related Structures Construction SIZE STANDARD: $45,000,000.00 COMPETITION: 100% Small Business Set-Aside. All technical inquires and questions relating to this solicitation are to be submitted via email to Contract Specialist, Logan Kohrmann, at Logan.R.Kohrmann@usace.army.mil by 22 December 2023 at 2:00pm CST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$20,831,465.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2024
March 18, 2024
To Be Determined, West Alton, MO
Related To This Project
West Alton, MO
Bid Date: Jan 16 2026
West Alton, MO
Bid Date: May 13 2025
West Alton, MO
Bid Date: May 19 2023
West Alton, MO
Bid Date: Jun 15 2023
Marshall, MO
Bid Date: Jun 21 2023
Harrisonville, MO
Bid Date: Jun 05 2023
Green City, MO
Bid Date: Jun 13 2023
Columbia, MO
Bid Date: Jun 15 2023
Lees Summit, MO
Bid Date: Jun 01 2023
Kansas City, MO
Bid Date: Jul 10 2018
Kansas City, MO
--
Kansas City, MO
Bid Date: Oct 16 2018
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
