Site work for a water / sewer project in Odell, Oregon. Completed plans call for site work for a water / sewer project.

Sealed bids for construction of Culbertson Drive Waterline. WORK TO BE DONE: The work to be done consists of furnishing all labor, equipment, tools, materials and supervision to construct approximately 400 lineal feet of eight (8) inch diameter ductile iron waterline along Culbertson Drive, which includes one creek crossing. The work will include excavation, disposal of excess excavation, waterline pipe, dewatering (if necessary), pipe zone material, backfill, connecting to existing water mains, waterline creek crossing, including approximately 30 lineal feet of 18-inch diameter steel casing and pipe supports at each wing wall, surface restoration, valves, fittings, thrust restraint, compaction, pressure and bacteriological testing, erosion control, traffic control, and miscellaneous work and appurtenances. Project must be substantially complete in 45 calendar days. PREVAILING WAGE: No bid will be considered by the Crystal Springs Water District unless the Bidder agrees to be bound by and will comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Each bid must contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the bidder is registered with the Construction Contractors Board, as required by ORS 701.035.ET.SEQ. No bid will be considered unless the First-Tier Subcontractor Disclosure form is submitted by the specified deadline. Faxed copies will NOT be accepted. PREQUALIFICATION: Not required. PRE-BID INQUIRIES: Questions and requests for clarification related to this Work shall be directed to the project engineer, Tom Ferrell, P.E., PACE Engineers, Inc., 4500 Kruse Way Suite 250, Lake Oswego, OR 97035. Phone: (503) 597-3222; email: tomf@paceengrs.com. This amount is not refundable and return of the documents is not required. Bids must be submitted on the prescribed forms and must be accompanied by certified check, cashier's check, or bid bond executed in favor of Crystal Springs Water District in an amount not less than ten (10) percent of the amount bid. The successful bidder will be required to furnish to Crystal Springs Water District a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of $30,000, unless exempt under ORS 279C. Acceptance of bids and award of contract will follow procedures provided by ORS 279C and in accordance with all applicable Crystal Springs Water District policies. Crystal Springs Water District Board reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Crystal Springs Water District. Crystal Springs Water District may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the agency it is in the public interest to do so.

Award

Water / Sewer

$175,280.00

Public - City

Site Work

10

15

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
22
Bidding Soon
527
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

July 24, 2023

img_map_placeholder

To Be Determined, Odell, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.