BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a museum in Fredericksburg, Virginia. Conceptual plans call for the construction of a museum; for the renovation of a museum; and for site work for a museum.

The 1816 Old Town Hall building, which houses the Fredericksburg Area Museum, is showing significant signs of degradation and deterioration in its sandstone foundation and mortar due to its continuous exposure and soft nature. This project involves performing necessary repairs in a manner so that the foundation maintains as accurate a historic representation as possible. The FY 2023 budget included funds for a consultant to evaluate the foundation and develop recommended procedures for restoration. An FY 2024 appropriation in the amount of $150,000 was for urgent, time-sensitive repairs. In FY 2026, staff will determine final costs for a full-scale repair of the sandstone foundation, currently estimated at $1.1 million. The Fredericksburg Area Museum is seeking grant funding for this construction, to supplement or supplant the planned General Fund funding. HVAC replacement is scheduled for FY 2027. Due to the sensitive nature of the artifacts presented in the Museum, staff recommends replacing and upgrading the HVAC system to maintain consistent temperature and humidity control for a stable environment within the building. Project is in the FY2024-2028 Capital Improvement Plan. As of December 5, 2024, construction is expected in FY2026-2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Museum

$1,275,000.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
76
Bidding Soon
1,965
All Active Projects
801
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

907 Princess Anne St, Fredericksburg, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.