BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an office development in Montesano, Washington. Completed plans call for the renovation of a office development.

22-631 1. Building 2: FMS Building: Remove an existing approximately 90 lineal foot trench drain inside workshop, cap off and abandon in place associated drain lines and cleanouts, and fill remaining trench with new concrete. 2. Building 2: FMS Building: Prepare existing 5,200 square foot workshop's concrete floor to receive resinous flooring. 3. Building 2: FMS Building: Install new mechanical exhaust fan in wastewater room. 4. Site: Add a new walk-through person gate with lock next to the main gate entrance. Alternates: Bid Alternate No. 1: Building 7: Resinous flooring on existing slab where indicated. Bid Alternate No. 2: Building 3: Resinous flooring on existing slab where indicated. Bid Alternate No. 3: Paint existing, above-ground propane storage tank. Bid Alternate No. 4: Building 2 : Paint existing, exterior CMU wall. Submit questions and clarifications regarding Drawings and Specifications no later than 5:00 pm, Thursday, 15 June 2023 ESTIMATED BID COST RANGE: $404,000 to $505,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Office

$505,000.00

Public - Federal

Renovation

14

18

8

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
55
Bidding Soon
1,419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

July 21, 2023

Project location map

21 Clemons Rd N, Montesano, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.