BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in La Puente, California. Completed plans call for the renovation of a residential development.

Questions regarding the RFQ are to be directed to Maria Ortiz at (626) 586-1814 or by email at maria.ortiz@lacda.org AH dimensions are for reference only. Contractor is responsible to field verify all dimensions including specified products and appliances before submission of bids, placing orders, and installations. 3. All brands of material or equipment specified are intended as a point of reference. All "equal" brands will be allowed and accepted after determined by LACDA as meeting the requirement of the specification. 5. Contractor is responsible for providing samples, technical specification, product cut-sheets and any information that LACDA requires for review and approval prior to installation. 6. All bids for new systems, appliances, fixtures and equipment shall include ancillary materials, costs of necessary work to ensure functional installations, and pass B&S inspection if applicable. 8. Contractor should not delete or eliminate any materials, equipment, or fixtures in the scope of work unless it is approved prior to the bid date. 9. Contractor should contact the LACDA inspector and provide project schedule in writing 48 hours prior to commencement of the work. 11. Contractors are prohibited to make any agreements, promises, or offers with owners to add any extra work that deviates from the scope of work without prior approval from LACDA. 12. There are no change orders allowed in the Senior Grant Program. 15. Contractor to schedule a final inspection with the LACDA inspector upon completion of the work. If a permit is obtained, the final inspection with LACDA should be after the permitting agency signs off the project. 7. All work specified in the scope of work and any necessary modification to mechanical, electrical, and plumbing systems due to performing the scope of work are required to be functional at the completion of the project. The bid includes the costs of all the necessary work to ensure proper functioning of the modified systems. 13. All colors and selections need to be approved by the owner in writing before installation. Contractor shall install all work per manufacturer specifications, recommendations, requirements, as well as LACDA requirements, and all applicable codes and standard industry practices. 10. Contractor shall meet with the owners in advance to discuss work schedules, project durations, working hours, and any possible impacts such as no water, no electricity, etc. LACDA requires contractors to provide at least one working shower and one working toilet (temporary is OK) at the end of every day. 14. Contractor to request and utilize LACDA standard forms for all aspects of construction administration, closeout, final acceptance, and payments. Contractor to turn over copies of all project documents, warranties, manuals, keys (to be keyed alike for multiple lockests if applicable), to project manager, inspector, and owner as required or requested. 2. Contractor is responsible to submit RFI for any scope of work that needs clarification to LACDA for review and approval. This includes any discrepancies discovered during field verification prior to submission of bids or during construction. 4. All substitutes or "equals" must be approved by LACDA prior to installation. Contractor is solely responsible for removal and/or replacement of un-approved items including but not limited to installed materials,

Post-Bid

Residential Subdivision

$280,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
235
Bidding Soon
3,718
All Active Projects
1,686
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 7, 2023

July 7, 2023

August 7, 2023

img_map_placeholder

14050 Whitesell St, La Puente, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.