BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in McAllen, Texas. Completed plans call for the construction of a 30,000-square-foot educational facility; and for site work for a educational facility.

Noble Texas Builders is seeking competitive proposals based on the provided 75% level of documents for ground up construction of (3) Mariachi & Black Box Buildings and associated sitework for McAllen ISD at McAllen Memorial High School, McAllen High School, and Nikki Rowe High School. Approximately 10,000 SF for each building. The following scopes of work are involved: selective demolition, sitework, utilities, concrete paving and foundations, masonry, stucco, structural steel, metal railings, rough carpentry, millwork, thermal and moisture protection, roofing, metal wall paneling, acoustical spray foam insulation, doors, frames, hardware, glass & glazing, metal framing & drywall, ceilings, acoustical paneling, flooring, painting, signage, toilet & bath accessories, fire extinguishers, theatrical rigging and lighting, fire protection, plumbing, HVAC, electrical, audio visual, and fire alarm SCOPE OF WORK A. The work done by the Painting Contractor shall include the Furnishings of all material, labor, tools and equipment required to complete the surface preparation, the painting, and the finishing of the building(s), as specified herein. B. See drawings and schedules for type and location of various surfaces requiring paint or finishing. C. Field painting will not be required on items specified to be completely finished at factory or any non-ferrous metals, unless specifically designated. D. Do not include prime coats on ferrous non-structural metal delivered with prime or shop coats, already applied. However, all abrasions on such prime coats shall be touched up with primers.

Post-Bid

Educational

$8,100,000.00

Public - City

New Construction, Site Work

91

21

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
10
Bidding Soon
288
All Active Projects
130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

August 14, 2023

img_map_placeholder

101 E Hackberry Ave, McAllen, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.