BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Washington, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

NTRODUCTION The City of Walla Walla Engineering Division is requesting qualifications for design engineering services as part of the Poplar Street IRRP - 5 th to 14 th Project. The City's intent is to have a consultant perform full design of the project and have it ready to bid by the end of 2025 (construction in 2026). The project has limits that extend 0.60 miles from 5 th Avenue to 14 th Avenue. BACKGROUND Poplar Street is a Minor Arterial which sees traffic volumes approaching 10,000 ADT. The road is mostly 4-lane with curb, gutter, and sidewalk. The road width and lane configurations vary throughout the project. Poplar Street is part of one of the major east-west corridors for the city and this segment passes through a mix of commercial and residential zones. Currently, the City's Infrastructure Repair and Replacement Plan (IRRP) fund is the primary local funding source for design. The City has obtained a Washington State Department of Ecology, Stormwater Financial Assistance Program Design Grant, and is seeking assistance to apply for other state and federal grants, possibly including: - TIB Urban Arterial Program - Washington State Department of Ecology - (Construction) Stormwater Financial Assistance Program - WSDOT - Pedestrian & Bicycle Program - WSDOT - City Safety Program - USDOT - Safe Streets for All (SS4A) - WSDOT - Surface Transportation Block Grant For further project information or questions, please contact Monte Puymon by email only at mpuymon@wallawallawa.gov. PROJECT DESCRIPTION AND CONSULTANT SERVICES The proposed project will replace water main/services, rehabilitate and/or replace sewer main/services, modify stormwater collection facilities with the goal of infiltration, rehabilitate the roadway, either update the traffic signal at 9 th /Poplar or replace with a roundabout, implement ADA improvements and address sidewalk trip/fall hazards at a minimum, upgrade street lighting, add bulb-outs, improve existing RRFB locations including the addition of one pedestrian island, implement the Council approved lane configuration - striping and signage, arborist tree evaluation for removal/replacement and trimming, and restore impacted irrigation and landscaping. In the absence of federal funding, there is NO DBE GOAL for this contract, though the possibility of federal funding later in the design process may add this requirement. The selected consultant will also support a stand-alone project to install valves and reservice existing fire suppression systems for connection to the primary project's new water main.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
110
Bidding Soon
1,920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

July 26, 2023

Project location map

Poplar St, Washington, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.