BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Le Claire, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work will commence within ten (10) days after written Notice to Proceed and shall be completed by September 29, 2023. Liquidated damages in the amount of Two Hundred Dollars ($200.00) per calendar day after September 29, 2023, until the date the project is finished. The work to be done includes approximately 278.6 square yards of PCC panel removal, 278.6 square yards of 8" PCC patching with integral curb and gutter, 8" subbase, and seeding/fertilizing are required including miscellaneous associated work including cleanup All quotations shall be submitted to the City Clerk of said City on or before the time herein set for receipt of quotations. All quotations shall be made on official documents furnished by the City, and any alterations in the official form of quotation will entitle the Council, at its option, to reject the quotation involved from consideration. Each quotation shall be sealed and plainly identified. The Contractor submitting the successful quotation will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The Contractor will be paid ninety-five percent (95%) of the Owner's final estimate of the value of acceptable work completed. Final payment will be made no earlier than thirty-one (31) days after completion of the work and acceptance by the Owner. No such final payment will be due until the Contractor has certified to the Owner that the materials, labor and services involved in the final estimate have been paid for in full.

Award

Roads / Highways

$53,357.00

Public - City

Paving, Site Work

18

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
35
Bidding Soon
630
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

img_map_placeholder

Multiple Locations, Le Claire, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.