BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Pembroke, Ontario. Completed plans call for the construction of a swimming pool; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for site work for a swimming pool.

The City of Pembroke is planning to build a new regional aquatic and wellness center which will replace its existing pool facility. The City envisions this new facility encompassing a six lane lap pool, hydrotherapeutic pool, and multi-purpose room with the ability to join or separate so that the reconfiguration of the space will accommodate a pickle ball court. The parking lot, building services and exterior landscaping, including a splash pad and pedestrian pathways, are all part of the project. The City will be seeking funding through the Green and Inclusive Community Buildings Program (GICB) and will require its new facility to meet the requirements of this program, both for accessibility and sustainability, specifically adhering to the Zero Carbon Building (ZCB) Design Standard (v3). All sub-contractors and suppliers interested in providing competitive pricing for any work related to the new recreation facility are requested to respond in writing by June 21, 2023 confirming their interest and area of expertise for the project. The intention of Council through this expression of interest is to maximize the benefits of this project to local sub-contractors and suppliers by providing the names of the responding companies to the prequalified design-builders during the Request for Proposals (RFP) period. No proposal or pricing, nor product information or samples are required at this time. A response to this EOI is not required for further involvement in the project. The design-builder prequalification process will take place in June/July 2023 and the RFP will be issued to the preselected design-builders in September 2023, with construction mobilization anticipated by late summer in 2024. NOTE: Expression of Interest (EOI) for Sub-Contractors and Suppliers has been posted by the owner on their website. https://pembroke.ca/en/news/expression-of-interest-eoi-for-sub-contractors-and-suppliers.aspx

Post-Bid

Swimming Pools

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
28
Bidding Soon
447
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

September 3, 2024

img_map_placeholder

424 Herbert St, Pembroke, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.