Site work and renovation of a water / sewer project in Stonewall, Texas. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Stonewall WCID will accept sealed bids for the installation of a 100,000 gallon ground storage tank. The Work to be performed includes furnishing all necessary supervision, machinery, insurance, bonds, materials, equipment, tools, labor, design, fabrication, material delivery, erection and construction, coating, inspection, and testing to complete the Work for the proposed tank. The OWNER reserves the right to waive all informalities and irregularities, and determine which Bids are most advantageous to the Project, and to award the Contract on this basis. Performance, payment, and warranty bonds shall each be issued in an amount equal to 100% of the Contract Amount as security for all the CONTRACTOR's obligations under the Contract Documents. All Bids must be accompanied by a Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price and in the form of a cashier's check made payable to Stonewall WCID, or a Bid Bond issued by a surety. The Contractor performing the replacement of the ground storage tank shall have a minimum of five (5) years of experience in this type of construction and five (5) projects of similar size and scope. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing a minimum of ninety-six (96) hours before the bid opening. Answers to all such requests will be given in writing to all bidders, in Addendum form, and all Addenda will be bound with, and made a part of, the Bidding Documents. Should a Bidder find discrepancies in, or omissions from the Plans or other Bidding Documents, or should he be in doubt as to their meaning, he should at once notify the Engineer in order that a written Addendum may be sent to all bidders. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents seventy-two (72) hours before the opening of bids. The proposal as submitted by the Contractor will be so constructed as to include any Addenda if such are issued by the Engineer twenty-four (24) hours before the opening of bids. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.Stonewall WCID will accept sealed bids for the installation of a 100,000 gallon ground storage tank. The Work to be performed includes furnishing all necessary supervision, machinery, insurance, bonds, materials, equipment, tools, labor, design, fabrication, material delivery, erection and construction, coating, inspection, and testing to complete the Work for the proposed tank. The OWNER reserves the right to waive all informalities and irregularities, and determine which Bids are most advantageous to the Project, and to award the Contract on this basis. Performance, payment, and warranty bonds shall each be issued in an amount equal to 100% of the Contract Amount as security for all the CONTRACTOR's obligations under the Contract Documents. All Bids must be accompanied by a Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price and in the form of a cashier's check made payable to Stonewall WCID, or a Bid Bond issued by a surety. The Contractor performing the replacement of the ground storage tank shall have a minimum of five (5) years of experience in this type of construction and five (5) projects of similar size and scope. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing a minimum of ninety-six (96) hours before the bid opening. Answers to all such requests will be given in writing to all bidders, in Addendum form, and all Addenda will be bound with, and made a part of, the Bidding Documents. Should a Bidder find discrepancies in, or omissions from the Plans or other Bidding Documents, or should he be in doubt as to their meaning, he should at once notify the Engineer in order that a written Addendum may be sent to all bidders. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents seventy-two (72) hours before the opening of bids. The proposal as submitted by the Contractor will be so constructed as to include any Addenda if such are issued by the Engineer twenty-four (24) hours before the opening of bids. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Renovation, Site Work

6

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
142
Bidding Soon
3,507
All Active Projects
1,334
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 15, 2023

July 17, 2023

December 14, 2023

img_map_placeholder

66 E Nunez St, Stonewall, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.