BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, remodeling and renovation of a library in Charlotte, North Carolina. Completed plans call for the demolition of a library; for the renovation of a library; for site work for a library; and for the construction of a 110,000-square-foot library.

Rodgers Leeper will accept Trade Contractor prequalification applications for the subject project for the following bid packages until June 22, 2023: 02D Selective Building Demolition, 03A Complete Concrete Sub and Superstructures, 03S Site Concrete, 04A Masonry, 05C Ornamental Railings, 05D Miscellaneous Steel, 06A Wood Structures, 06B Carpentry and Casework, 07A Roofing and Accessories, 07B Waterproofing and Sealants, 07C Fireproofing, 07E Exterior Metal Panel Systems, 07G Firestopping, 07H Historical Façade Restoration, 08A.2 Interior Glass Assemblies, 08B Passage Door Assemblies, 08C Service Door Assemblies, 09A Drywall Assemblies, 09C Acoustical Assemblies, 09D Hard Tile, 09E Floor Coverings – Resilient and Carpeting, 09F Painting and Wall Coverings, 09T Terrazzo, 10A Specialties, 10B Signage, 10D Operable Partitions, 11B Food Service Equipment, 11F Theatrical Equipment, 12A Window Treatments, 12C Fixed Seating, 18A General Works, 18B Final Cleaning, 21A Fire Protection, 22A Plumbing Systems, 23A HVAC Systems, 23B Test and Balance, 26A Electrical, 27A Communication Systems, 27B Audio Visual, 28A Electrical Safety and Security, 31A Complete Sitework, 31C Deep Foundation Systems, 32B Site Pavers, 32C Landscape and Irrigation. New Main Library, the flagship of Charlotte Mecklenburg Library’s system, is approximately 110,000 SQFT in Uptown Charlotte, and includes spaces for print and digital collections, meeting rooms, study spaces, program and event gatherings, a café, and a digital experiences room. New Main Library will connect to the adjacent existing Spirit Square which includes renovation of the McGlohon Theater and Duke Energy Theater. As of June 2023, prequalification is currently taking place. Subcontractor bidding will then take place in separate stages, with the first going out in September/October 2023 and the second releasing in December 2023/First Quarter 2024. New construction will begin in the first quarter of 2024 and go through 2025. Interested parties should contact the Construction Manager directly to prequalify for bidding opportunities. *Overall construction budget is not yet finalized but likely in the $145 million range.

Award

Library

$145,000,000.00

Public - City

Demolition, New Construction, Remodeling, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
97
Bidding Soon
1,665
All Active Projects
695
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 22, 2023

February 19, 2024

img_map_placeholder

310 N Tryon St, Charlotte, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.