Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 3, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a laboratory facility in Edinburg, Texas. Completed plans call for the renovation of a laboratory facility.
Construction cost between 250,000 and 500,000. The contractor will provide a turnkey product to include, but not limited to, all materials as specified and the correct and proper installation of all material. Contractor will provide all permits as required. The project is located at the Cattle Fever Tick Research Laboratory (CFTRL), 2675 N. Moorefield Rd, Edinburg, TX 78541. a. The Contractor will work with facility personnel to ensure project is accomplished in a timely manner. b. The Contractor's work shall adhere to the criteria stated within these project requirements and specifications. c. Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000. Employee payroll logs for the project will be required to verify wage rates are being adhered to. d. Materials and Installation shall meet the applicable sections of the Uniform Federal Guide Specifications (UFGS). The UFGS specifications can be found on the listed on the Whole Building Design Guide Construction Criteria Base UFGS page e. The Contractor's work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal and local code requirements as well as current industry standards, (i.e.: UBC, IBC, ASTM, etc.) and health and safety codes, in effect at the time of contract award. f. Payment bid or other bonds may be required per the Contracting Officer's bid package. Obtaining and the cost of these bonds is the responsibility of the Contractor. Proof of Insurance is also required. g. Shutoff of utilities, if required, shall be scheduled no less than ten working days in advance. h. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work. i. Clean up all debris from construction site once job is completed. Buildings will be occupied while construction is ongoing. Contractor will schedule work with location in order to allow location to meet current research needs. The contractor will provide a turnkey product to include, but not limited to, all materials as specified and the correct and proper installation of all material. Contractor will provide all permits as required. The project is located at the Cattle Fever Tick Research Laboratory (CFTRL), 2675 N. Moorefield Rd, Edinburg, TX 78541. a. The Contractor will work with facility personnel to ensure project is accomplished in a timely manner. b. The Contractor's work shall adhere to the criteria stated within these project requirements and specifications. c. Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000. Employee payroll logs for the project will be required to verify wage rates are being adhered to. d. Materials and Installation shall meet the applicable sections of the Uniform Federal Guide Specifications (UFGS). The UFGS specifications can be found on the listed on the Whole Building Design Guide Construction Criteria Base UFGS page e. The Contractor's work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal and local code requirements as well as current industry standards, (i.e.: UBC, IBC, ASTM, etc.) and health and safety codes, in effect at the time of contract award. f. Payment bid or other bonds may be required per the Contracting Officer's bid package. Obtaining and the cost of these bonds is the responsibility of the Contractor. Proof of Insurance is also required. g. Shutoff of utilities, if required, shall be scheduled no less than ten working days in advance. h. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work. i. Clean up all debris from construction site once job is completed. Buildings will be occupied while construction is ongoing. Contractor will schedule work with location in order to allow location to meet current research needs. The Contract time for this project is 360 calendar days.
Post-Bid
Laboratories
$500,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2023
August 29, 2023
22675 N Moorefield Rd, Edinburg, TX
Related To This Project
Edinburg, TX
Bid Date: Jun 07 2023
Edinburg, TX
Bid Date: Jul 27 2023
Edinburg, TX
Bid Date: Jul 27 2023
Edinburg, TX
Bid Date: Jun 20 2023
Edinburg, TX
Bid Date: Aug 05 2023
Edinburg, TX
--
Edinburg, TX
Bid Date: Aug 09 2023
Edinburg, TX
--
Edinburg, TX
Bid Date: Feb 21 2024
Edinburg, TX
Bid Date: Mar 20 2019
Edinburg, TX
Bid Date: Jul 19 2021
Edinburg, TX
Bid Date: Jun 07 2023
Edinburg, TX
--
Edinburg, TX
Bid Date: Jun 07 2023
Edinburg, TX
Bid Date: Jun 01 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed