Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.
Description of Work This Requisition solicits proposals for construction services to repair damaged elements of the Pier B North wharf at the Alabama State Port Authority Main Docks facility in Mobile, AL. The project includes the removal and reconstruction of damaged concrete deck, timber fender components and ductile iron water line as specified in the attached drawings and scope of work. All work shall be in accordance with the requirements stated herein, Scope of Work Specifications, Reference documents and drawings, Insurance Requirements and applicable State of Alabama and Federal Laws. The work consists principally of providing bonds, labor, materials, equipment, insurance, and supervision necessary to perform the scope of work indicated in the contract documents. The work includes the removal and replacement of a section of concrete wharf deck overhang, timber walers, timber cap, timber piles, and section of water line including the disposal of all removed materials associated with the work. The timber walers, timber cap, timber piles, water pipe, and all mounting hardware shall be new material. All materials, labor, tools, rigging and equipment necessary to perform the work shall be included by the Contractor in the proposal. It is the Contractor's responsibility to field verify all dimensions and site conditions essential for the successful completion of the work. The Contractor shall not be entitled to any additional compensation for any work or expense resulting from the neglect of verifying all existing site conditions. All Contractors submitting bids are to carefully examine the site of the proposed work and thoroughly review the contract requirements prior to submission of a bid proposal. Each Bidder shall satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed contract. The submission of a proposal shall be proof that the bidding Contractor has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed Contract. All bidding Contractors must hold a current license from the State Licensing Board for General Contractors, Montgomery, AL with the classification of (H/RR) Heavy/Railroad, (H/RR-S) Piers or (H/RR-S) Specialty ConstructionMarine Construction. The work performed under this contract shall not commence until the Contractor has submitted a Performance Bond, Labor & Material Bond, and Certificate of Insurance in an acceptable form. Performance Bond and Labor & Material Bonds shall be in an amount equal to 100% of the contract price; Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed resident agent in the State of Alabama. The Contractor shall comply with all Federal and State laws, local ordinances and regulations, and all orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work. The Contractor will be required to complete the work under the Contract within 120 calendar days after receipt of a "Notice to Proceed". Work will start within 10 calendar days after receipt of notice to proceed. The work will have to be scheduled and performed in a manner that will not interfere with the operations of the facility ongoing in the immediate and adjacent areas. ASPA intent is that work hours will be during normal day light hours. ASPA cargo handling operations take priority over construction activities; therefore, the Contractor will be required to schedule his operations as necessary to facilitate marine vessel berthing. ASPA Operations will make every effort to inform the Contractor of the vessel berthing schedule as far in advance as possible. The work area is directly adjacent to active wharfs with marine and warehouse activity in the general vicinity of the work area, thus the Contractor must coordinate closely with ASPA Engineering and Operations personnel to schedule work activities to ensure that they do not interfere with normal operations. The Contractor shall plan work activities in such a way as to keep the maximum amount of wharf area orderly and accessible during all phases of the project. The Contractor must provide a high visibility temporary barrier to delineate the limits of construction activities on the wharf at all times. The Contractor must capture and dispose of all waste materials generated by the construction activities. No debris will be allowed to fall into the water below. The Contractor is responsible for the disposal of all waste materials associated with the work. The Contractor shall place a competent superintendent on the Project who shall have experience in the work being performed under the Contract. The assigned superintendent shall have responsibility for the day-to-day operations of the work and shall remain on the Project site while the work under the Contract is being performed. It is the responsibility of the Contractor to become familiar with all conditions affecting the nature and manner of the work. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Any questions regarding the procurement should be directed to Mike Thompson, Project Manager, at phone number (251) 441-7224 or email mike.thompson@alports.com.
Award
Water / Sewer
$78,913.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2023
August 14, 2023
900 Alabama State Docks Blvd, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Jun 21 2023
Mobile, AL
Bid Date: Jun 07 2023
Mobile, AL
Bid Date: Jun 16 2023
Mobile, AL
Bid Date: Sep 01 2021
Mobile, AL
Bid Date: May 26 2021
Mobile, AL
Bid Date: Jun 07 2023
Mobile, AL
Bid Date: Jun 15 2023
Mobile, AL
Bid Date: Jun 27 2023
Mobile, AL
Bid Date: Jun 02 2023
Mobile, AL
Bid Date: Jun 02 2023
Mobile, AL
Bid Date: Jun 15 2023
Mobile, AL
Bid Date: Jun 02 2023
Mobile, AL
Bid Date: Jun 07 2023
Mobile, AL
Bid Date: Aug 25 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.