Site work and paving for a road / highway in Moorestown, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of July 24, 2023, Project has been awarded. Award amount is $921,613.13** The work includes the furnishing of all labor, material, and equipment necessary or required to complete all work set forth in the Specifications and shown on the Plans of the construction of 2023 Reconstruction Program - W. Central Avenue located in the Township of Moorestown, New Jersey, including but not limited to 8" CLDIP water main, valves and hydrants, roadway excavation, Surface Course (9.5M64, 2" Thick), Base Course (19M64, 4" Thick), DGA (6" Thick), installation of concrete curb, ADA curb ramp, inlets, traffic striping. All bid guarantees shall be accompanied by an executed consent from an approved surety company, licensed to conduct business in the State of New Jersey, agreeing to furnish the required Performance, Payment and Maintenance Bond upon the award of contract. All bidders and the general public are invited to be present for this bid opening. All bids must be submitted on the prescribed bid forms. One original and one copy are requested. The signed Proposal forms and bid security must be delivered to the place on or before the hour named above. The accepted bidder must sign the contract within ten (10) days after the Notice of Award or forfeit his bid security. Bid securities will be returned to all but the three apparent lowest responsible bidders. All other bid securities will be returned after awarding and signing of the contract and approval of the Contractor's Performance Bond. In accordance with P.L. 2021, c. 301 a contractor submitting the lowest bid for a contract that is subject to the Prevailing Wage Act, if that bid is 10 percent or more lower than the next lowest bid, to certify to the public body that the prevailing wage rates required by the Act shall be paid. Bidders are required to comply with the requirements of N.J.S.A 10:5-31 et seq. and N.J.A.C. 17:27. (Affirmative Action Law); N.J.S.A. 52:32-44 (Business Registration Act); and N.J.S.A. 34:11-56.48 et seq. (Public Works Contractor Registration Act). The right is reserved to reject any or all Proposals, in whole or in part, or to make awards to such bidder or bidders, who, in the judgment of Moorestown Township makes the most advantageous bid and to waive such informalities as may be permitted by law. Patricia L. Hunt, RMC, Township Clerk June 4, 2023 ($44.85)

Award

Roads / Highways

$921,613.00

Public - City

Paving, Site Work

14

11

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
213
Bidding Soon
3,985
All Active Projects
1,634
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2023

July 28, 2023

img_map_placeholder

W Central Ave, Moorestown, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.