BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in German Township, Indiana. Completed plans call for site work for a road / highway.

Request for Quote The City of Columbus wishes to make certain public improvements Project #23-10 CR 450 S Signal Improvements Submitted quotes will be opened and taken under advisement at the City of Columbus' Board of Public Works and Safety (BPWS) meeting that morning. Following verification of the lowest responsive and responsible quote, an award will be made at the next BPWS meeting. The City of Columbus expressly reserves the right to reject any and all quotes. The signed Quote Form will be the contract. You are required to submit a fully executed Comprehensive Compliance Form (CCF) along with the contract. You are required to submit a copy of the Certificate of Liability Insurance with the quote. Insurance coverage is required in the amount of not less than Three Hundred Thousand Dollars ($300,000) for any one person, nor less than One Million Dollars ($1,000,000) for any one accident. The work must be completed by October 31, 2023. Failure to complete projects on time will result in the deduction of $100 per calendar day, not counting weekends and holidays, as liquidated damages, from any money due the Contractor. Question Deadline 06/19/2023 at 12:00 PM ET Contractor will be required to obtain a Request for Special Use of Right of Way for any street, traffic lane, alley, parking space or sidewalk closure. 04.01 Intent of Contract The scope of the work shall be loop detector installation, and signal head installation. Installation shall be as shown in the advertisement for bids. All work will be performed at the detailed and specific direction of the City Engineer's office. Contractor shall be prepared to enter into an agreement immediately upon award of Contract. Project shall be completed by October 31, 2023. Failure to complete on time shall result in liquidated damages in the amount indicated in the current Schedule INDOT. 104.03 Maintenance of Traffic Traffic control including signs, lights, flag person, etc., shall be the responsibility of the contractor. Refer to item 30, paragraph 4 of General Conditions, Specification No. 100. The contractor shall install temporary pavement markings as needed to maintain the safe flow of traffic. The cost of the temporary markings shall be included in the cost per ton of the asphalt

Bid Results

Roads / Highways

$169,427.00

Public - City

Site Work

3

5

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
76
Bidding Soon
1,069
All Active Projects
470
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

August 22, 2023

img_map_placeholder

County Rd 450 N, German Township, IN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.