BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a civil project in Northport, Alabama. Completed plans call for site work for a water / sewer project.

As of August 31, 2023, this project has been awarded to South Civil Contracting and the awarded amount was $975,750.01. Per addendum 2 bid date time extended from 10am to 2pm, date remains the same. project shall consist of 6" and 3" PVC water mains, booster pump station, and appurtenances. 2. Award of the Contract will be made within forty-five (45) calendar days from the date of the bid opening. 1 Prequalification of Bidders is not required All bidders must submit with their proposal, Contractor's license number and a copy of the license. State law, AL CODE 34-8-8(b), requires all bids to be rejected which do not contain the General Contractor's current license number. 4. 6.1 All questions about the meaning or intent of the Contract Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or ENGINEER Any questions concerning the pre-bid conference shall be directed to Draper McMillan, PE, (205) 759-1521. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama All bonds, sureties and/or cashier checks will be made payable to the Owner for an amount not less than 5 percent of the Owner's or its Engineer's estimated cost of the project or of the total bid in the proposal, but in no event more than $10,000.00. 5.

Award

Water / Sewer

$975,750.00

Public - City

Addition, Demolition, Site Work

17

9

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
41
Bidding Soon
533
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

July 27, 2023

img_map_placeholder

Mormon Rd, Northport, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.