BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Stanley, Idaho. Completed plans call for site work for a bridge / tunnel.

Furnish, fabricate, and treat structural timber, including all required yard lumber needed to render one complete glued-laminated stringer type trail bridge system having timber hand railing and running planks. Furnish all required anchoring/fastening hardware including but not limited to anchor bolts, lag screws, malleable iron washers, nails, plate washers, bearing shoes with elastomeric pads, and other structural steel as required to render a complete bridge system, delivered to the Material Staging Area location noted on the Drawings. Deliver the complete bridge system to the Material Staging Area location noted on the Drawings. The Material Staging Area is located approximately 22 miles from the Ketchum Ranger District Office in Ketchum, Idaho, via State Highway 75 and Forest Road #162. Coordinate material delivery with Braidy Richins at 208.731.0176 or by email at braidy.richins@usda.gov a minimum of 48 hours prior to delivery. Thursday and Friday deliveries are not permitted. The week of October 2nd, 2023, no later than October 4th. Supplier shall have complete bridge system ready for shipment at least one week prior to required delivery date. The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed; (b) prosecute the work diligently; and (c) supply all the bridge system materials by the above noted "required delivery date". Inspection of the delivered material will be made by the Contracting Officer's Representative. Materials not completed in accordance with the Contract Documents shall be replaced without additional compensation to the Supplier. Estimated Price Range $25,000 to $250,000 Furnish, fabricate, and treat structural timber, including all required yard lumber needed to render one complete treated timber glued-laminated stringer type trail bridge system having timber railing and running planks. Furnish all required anchoring/fastening hardware including but not limited to anchor bolts, lag screws, malleable iron washers, nails, plate washers, bearing shoes with elastomeric pads, and other structural steel as required to render a complete bridge system, delivered to the Material Staging Area location noted on the Drawings.

Award

Bridges / Tunnels

$50,870.00

Public - Federal

Site Work

8

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
101
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

July 14, 2023

img_map_placeholder

ID-75, Stanley, ID


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.