Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2023 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Cold Lake, Alberta. Contact the soliciting agency for additional information.
This is a notice to trade contractors, vendors, and suppliers (herein noted as "Parties") to pre-qualify for the opportunity to tender this project, and to provide the Parties an opportunity to apply for security clearances. Note there is no guarantee that the project will proceed or that any security clearance(s) will be granted under the sponsorship process in a timley fashion or otherwise. EllisDon Construction Services Inc. (EllisDon) as the Design Builder, along with its design partner, Stantec have been contracted to provide design services and constructability oversight to complete the design of the Royal Canadian Air Force (RCAF) infrastructure that will support the Future Fighter Capability Project (FFCP). The infrastructure will provide shelter and a working environment capable of supporting the operation and maintenance of a yet to be determined advanced fighter aircraft. Construction of a new a Fighter Squadron Facility consisting of two fully operational Tactical Fighter Squadrons (TFS) and the Operational Training Unit (OTU), including but not limited to: offices, administrative spaces, mission planning rooms, briefing / de-briefing rooms, meeting rooms, classrooms, auditorium, speciality training rooms including simulators (SIMS) accommodations and Part-Task Trainers accommodations, hangars, maintenance bay facilities, specialty aircraft maintenance labs, shops and storage, IT offices and server rooms, building support spaces, and common spaces. This work package will also include the construction of nearby airfield pavements, apron and taxiway access lane edge lighting, and apron flood lighting consisting of concrete and asphalt. Construction of infrastructure will encompass the following scopes of work. Scope of work, using Masterformat Divisional breakdown as a reference, may include, but are not limited to: 01 45 00 Surveying 03 11 00 Concrete Formwork 03 15 00 Concrete Accessories 03 20 00 Reinforcing Steel 03 30 00 Concrete Supply 03 35 00 Concrete Placing & Finishing 14 20 00 Elevator & Lifts 31 00 00 Earthworks 31 60 00 Piling 33 00 00 Utilities & Underground 48 16 00 Geothermal Energy Any questions relating to this Pre-Qualification can be addressed to: Scott Barabash, CET, GSC, CEC Senior Estimator EllisDon Construction Services 780-444-3042 sbarabash@ellisdon.com Deadline for receipt of questions: 2023-07-13 14h00:00 HAR Official bid documents must be obtained from www.merx.com
Post-Bid
Transportation Terminals
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
