BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Napoleon, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

for furnishing all services, labor, materials and equipment necessary for the improvement of the following described roads: SECTION (Harrison) Township Road P3 from US 6 to Road 12 (Richfield) Township Road 1C from Road L to Road K (Monroe) Township Road K from SR 108 to Road 12 (Control Joints at bridge on both ends) (Village of Hamler) Cleveland Street from First to Third Street (Village of Hamler) Main Street from SR 18 to English Street PROJECT LENGTH: 4.63 Miles PROJECT TYPE: Asphalt Concrete Leveling, Resurfacing and Related Roadway Improvements A portion of the project will be funded by the Local Transportation Improvement Program as administered by the Ohio Public Works Commission. All Contractors and Subcontractors involved with the project will, to the extent practicable use Ohio products, materials, services and labor in the implementation of their project. Additionally, Contractor compliance with the equal employment opportunity requirements of the Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972 and the Governor's Executive Order 84-9 shall be required. Domestic steel use requirements as specified in Section 153.011 of the Revised Code apply to this project. Copies of Section 153.011 of the Revised Code can be obtained from any of the offices of the Department of Administrative Services. Each bidder is required to file with his bid a bid guaranty in the form of either: 1) A bond, executed by a surety company authorized to do business in the State of Ohio, for the full amount of the bid; or 2) A certified check, cashier's check or letter of credit pursuant to Chapter 1305 of the Ohio Revised Code, in the amount of ten (10%) percent of the bid Bid guaranty must be provided as guarantee that if the contract be awarded on such bid, the bidder will enter into a contract and the performance of it will be properly secured. The successful bidder, if using a 10% bid guaranty, shall be required to provide a contract performance and payment bond, executed by a surety company authorized to do business in the State of Ohio, for the full amount of the bid. Estimated total cost of the improvements is $650,000.00 The said Board reserves the right to reject any or all bids.

Award

Roads / Highways

$626,537.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
55
Bidding Soon
1,081
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 10, 2023

img_map_placeholder

Multiple Locations, Napoleon, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.