BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Osakis, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Interior Structural Improvements o Replace 24" manway gasket o Grind off weld spatter and erection scab marks below HWL o Install Submersible Mixer . Interior Wet Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Interior Dry Structural Improvements o Install new 18"x24" manway in drywell tube o Replace existing bowl drain valve o Replace light fixture on interior of dry riser o Temporarily remove insulation and aluminum jacketing from inlet pipe to facilitate abrasive blasting and painting of pipe. Reinstall after coating is complete. o Install openings with cover plates in the center of each of the two (2) platform floors, including condensate ceiling. o Relocate drain as required in condensate floor . Interior Dry Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Exterior Structural Improvements o Install anchor point on exterior (roof side) of drywell tube o Install separate aircraft warning obstruction light bracket next to hand rail o Remove existing light near vent and replace with double aviation light. Grind roof plate smooth at removed light bracket location. o Install weather proof plugs in unused antenna cable couplings on top of drywell tube. Plug holes or install bolts in holes in side of drywell tube. o Replace 24" diameter bolted access manway with 24" diameter hinge covered roof access manway. o Install one (1) 24" diameter hinge covered roof ventilation manway. o Replace existing handrail system with new pipe style handrail system in conformance with OSHA and AWWA regulations. o Clean debris from overflow pipe screen. . Exterior Coating o Abrasive blast (SSPC-SP-6) all reservoir surfaces o Coat all reservoir surfaces with zinc / epoxy / urethane / fluoropolymer system. Submit questions to Seth Hayek, Nero Engineering, shayek@neroeng.com, (612) 280-3890.

Award

Water / Sewer

$494,980.00

Public - City

Renovation, Site Work

5

16

2

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
15
Bidding Soon
165
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

August 29, 2023

img_map_placeholder

To Be Determined, Osakis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.