Demolition, site work, new construction and addition to a water / sewer project in Chesapeake, Virginia. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The Work under this project consists of: 1. Demolition of the two existing southern spent cleaning solution tanks and associated support pad and portions of the existing spent cleaning solution containment walls and the tank base slab to permit installation of a new drainpipe and electrical conduits from the new UV Disinfection Building to the existing Membrane/Chemical Building basement. 2. Construction of new concrete walls to enclose the containment area serving the two remaining north spent cleaning solution tanks. 3. Installation of a new UV Disinfection Building including restoration of the existing base slab and a new foundation wall followed by installation of the new prefabricated UV Disinfection Building. 4. Installation of two new UV disinfection reactors and associated stainless steel piping, false floor grating system, HVAC equipment and lighting within the new UV Disinfection Building. 5. Installation of new electrical power/control panels for the new UV reactors in the Membrane/Chemical Building existing electrical room and additional UV control panels in the new UV Disinfection Building. 6. Installation of new elevated outdoor UV influent and effluent piping and associated pipe supports between the new UV Disinfection Building and the modified existing Finished Water Chemical Addition Structure. Prior to starting the modifications described above, reroute the existing water quality sample and drain lines to a Contractor furnished portable enclosure and connect to the new instruments installed in the enclosure and connected to the existing plant control system. 7. Once the new portable enclosure and water quality instruments are operational and approval is given by the City, modifications requiring a plant shutdown can begin within the Finished Water Chemical Addition structure. 8. Following completion of the plant shutdown, the new water quality instruments and associated sample lines shall be relocated to their permanent location within the Finished Water Chemical Addition Structure (one instrument at a time within 1 hour each) and the temporary enclosure shall be removed from the site. 9. Startup and testing of the new UV reactors shall be completed once finished water can be passed through them. The Work under this project consists of: 1. Demolition of the two existing southern spent cleaning solution tanks and associated support pad and portions of the existing spent cleaning solution containment walls and the tank base slab to permit installation of a new drain pipe and electrical conduits from the new UV Disinfection Building to the existing Membrane/Chemical Building basement. 2. Construction of new concrete walls to enclose the containment area serving the two remaining north spent cleaning solution tanks. 3. Installation of a new UV Disinfection Building including restoration of the existing base slab and a new foundation wall followed by installation of the new prefabricated UV Disinfection Building. 4. Installation of two new UV disinfection reactors and associated stainless steel piping, false floor grating system, HVAC equipment and lighting within the new UV Disinfection Building. 5. Installation of new electrical power/control panels for the new UV reactors in the Membrane/Chemical Building existing electrical room and additional UV control panels in the new UV Disinfection Building

Bid Results

Water / Sewer

$4,027,000.00

Public - City

Addition, Demolition, New Construction, Site Work

61

18

20

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
67
Bidding Soon
1,239
All Active Projects
568
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 24, 2023

September 21, 2023

March 24, 2025

img_map_placeholder

To Be Determined, Chesapeake, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.