BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 8, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a swimming pool in Eagle, Colorado. Conceptual plans call for the demolition of a swimming pool; for the construction of a swimming pool; and for site work for a swimming pool.

Reference Number 0000322187 Contact Information Melissa Daruna 9704049705 melissa.daruna@townofeagle.org The project consists of demolition and removal of the existing pool and site features, construction of the new pool, decking and bathhouse, regrading the surrounding site, landscaping, and repaving walkways. Design concepts have been drafted. The Town and Mountain Rec. wish to proceed with a Construction Manager at Risk (CMAR) process to finalize the project design and execute construction. CMAR selection will take place in late summer 2023.

Conceptual

Swimming Pools

$13,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
11
Bidding Soon
202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.