BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cudahy, Wisconsin. Completed plans call for site work for a water / sewer project.

The project consists of storm sewer extensions at multiple locations. It also consists of a storm lateral project to include the connection of private property sump pump discharges at the front of the home to the City's storm sewer as part of the MMSD's PPII program. The estimate of quantities is as follows: 3,327 LF Furnish & Install 6" SDR 26 Storm Lateral 63 EA Furnish & Install Connection to Exist Sump Pump Discharge 815 LF Furnish & Install 10"-12" Storm Sewer 15 VF Furnish & Install 48" Storm Manhole 25 VF Furnish & Install 24"x36" Catch Basin 2,288 SY Furnish & Place 7" Concrete Pavement 855 LF Furnish & Place 30" Concrete Curb & Gutter 2,280 SF Furnish & Place 5" Concrete Sidewalk 893 SY Furnish & Place Topsoil & Sod No bid will be received unless a certified check or bank draft payable to the City of Cudahy, or a satisfactory bid bond in an amount no less than five percent (5%) of the bid, shall accompany each bid as a guarantee that if the bid is accepted, the bidder will execute and file the Agreement and a 100% performance bond and payment bond, within ten (10) days after the Notice of Award. In case the bidder fails to file such contract and bond within the time set forth, the check or bid bond shall be forfeited to the City of Cudahy as liquidated damages. No bid shall be withdrawn for a period of ninety (90) days after the bid opening date without the consent of the City of Cudahy. The City of Cudahy reserves the right to accept any bid most advantageous to the City, waive any technicality or reject any or all bids. Award of this contract is scheduled for around June 27th, 2023. The Contractor may start work anytime between July 10th, 2023 and September 1, 2023. Once started and once barricades are in place the contractor shall have 40 calendar days to complete work. Restoration of front resident yards and terrace areas shall be completed by October 15th 2023 to allow for sod establishment. Completion date of all other work shall be November1st, 2023.

Award

Water / Sewer

$825,889.00

Public - City

Site Work

26

7

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
63
Bidding Soon
1,443
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.