BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Winnipeg, Manitoba. Design plans call for the renovation of a fire / police facility.

Winnipeg Police Services HQ Evidence Control Unit Structural Upgrades, located on the P1 level to accommodate a new high-density racking system. Total floor area approximately 10,500 square feet. Assess the existing structural floor slab and steel framing in order to determine a safe maximum pallet weight for the new high-density racking system. It is assumed that the capacity of the floor can be enhanced with the placement of a bonded topping. A preliminary high-density racking system layout that accommodates approximately 1200 pallets is available. The new racking system requires a flat level floor. Eliminate existing floor slopes and existing floor drains by removing and replacing the concrete topping over the existing structural slab. Approximately 1,500 square feet of the concrete topping has de-bonded from the structural slab. A raised floor area of approximately 3,100 square feet is to be removed as shown on drawings. Modify the existing double interlock pre-action fire-protection system to accommodate the high-density racking system. This could possibly include in-rack sprinklers. Modify the existing HVAC system to accommodate the high-density racking system. This will likely mean re-routing of the ducts in ECU to run north-south down the fork-lift aisle. Any and all other Building Code related items (Life Safety, Electrical, etc.) to be addressed as part of this design. Supply and installation of a Radio Shuttle high-density racking system to accommodate up to 1200 pallets. TIMELINE: Design status will not be released. Updates will be made upon issuance of tender for construction, there is timelines at this stage. Updates may be available early 2025.

Design

Fire / Police

$2,750,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
527
All Active Projects
229
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 19, 2025

img_map_placeholder

245 Smith St, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.