Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in Winnipeg, Manitoba. Working plans call for the renovation of a fire / police facility.
Winnipeg Police Services HQ Evidence Control Unit Structural Upgrades, located on the P1 level to accommodate a new high-density racking system. Total floor area approximately 10,500 square feet. Assess the existing structural floor slab and steel framing in order to determine a safe maximum pallet weight for the new high-density racking system. It is assumed that the capacity of the floor can be enhanced with the placement of a bonded topping. A preliminary high-density racking system layout that accommodates approximately 1200 pallets is available. The new racking system requires a flat level floor. Eliminate existing floor slopes and existing floor drains by removing and replacing the concrete topping over the existing structural slab. Approximately 1,500 square feet of the concrete topping has de-bonded from the structural slab. A raised floor area of approximately 3,100 square feet is to be removed as shown on drawings. Modify the existing double interlock pre-action fire-protection system to accommodate the high-density racking system. This could possibly include in-rack sprinklers. Modify the existing HVAC system to accommodate the high-density racking system. This will likely mean re-routing of the ducts in ECU to run north-south down the fork-lift aisle. Any and all other Building Code related items (Life Safety, Electrical, etc.) to be addressed as part of this design. Supply and installation of a Radio Shuttle high-density racking system to accommodate up to 1200 pallets. TIMELINE: Design status will not be released. Updates will be made upon issuance of tender for construction, timelines have not been determined at this time. Updates may be available late 2025.
Final Planning
Fire / Police
$2,750,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2025
245 Smith St, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jun 27 2023
Winnipeg, MB
Bid Date: Jun 26 2023
Winnipeg, MB
Bid Date: Jun 20 2023
Winnipeg, MB
Bid Date: Jun 30 2023
Winnipeg, MB
Bid Date: Jul 06 2023
Winnipeg, MB
Bid Date: Jun 19 2023
Winnipeg, MB
Bid Date: Jun 21 2023
Winnipeg, MB
Bid Date: Jun 09 2023
Winnipeg, MB
Bid Date: Jun 30 2023
Winnipeg, MB
Bid Date: Jun 15 2023
Winnipeg, MB
Bid Date: Jun 14 2023
Winnipeg, MB
Bid Date: Jun 27 2023
Winnipeg, MB
Bid Date: Jun 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.